Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Site operation intelligent scheduling method

A technology of intelligent scheduling and operation and maintenance, applied in the directions of genetic rules, instruments, data processing applications, etc., can solve problems such as the complexity of the dispatching algorithm process, the inability to guarantee the speed and quality of work execution, and the inability to improve the efficiency of on-site maintenance. , to achieve the effect of improving efficiency and simplifying the algorithm process

Inactive Publication Date: 2018-05-01
海南电网有限责任公司
View PDF6 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, in the prior art, usually only one of the on-site operation and maintenance influencing target factors is optimized. For example, a PDA-based on-site operation and maintenance daily work planning method (CN106934484A) records the first, obtaining abnormal point aggregation Generate abnormal work orders and filter abnormal work orders according to the dispatch area; second, calculate the shortest path from the maintenance point to the stagnation point and the mutual shortest path of the abnormal work order, and generate a repeated path matrix; third, generate a preliminary route by scanning the repeated path matrix Linked list to obtain preliminary dispatching routes, and sort them in descending order of urgency; fourth, select the preliminary route with the greatest urgency, and judge whether to add or delete points; fifth, execute the algorithm of adding or deleting points to generate fine dispatching route, so that the workload of each dispatching route is saturated without exceeding the specified workload, and the total urgency of the route is high; this method implements an accurate dispatching algorithm, and the waste of operation and maintenance resources is small, but the entire dispatching algorithm process is relatively complicated, and The speed and quality of work execution cannot be guaranteed, and the efficiency of on-site maintenance cannot be improved well on the whole

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Site operation intelligent scheduling method
  • Site operation intelligent scheduling method
  • Site operation intelligent scheduling method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047]The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0048] see figure 1 , which is a flow chart of an on-site operation and maintenance intelligent scheduling method provided by an embodiment of the present invention, and the on-site operation and maintenance intelligent scheduling method includes:

[0049] S1: Establish corresponding mathematical models for multiple objectives of on-site operation and maintenance, among which, the objectives of on-site operation and maintenance include the shortest task completion t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention discloses a site operation intelligent scheduling method. The method comprises the steps of: respectively establishing corresponding mathematic models for a plurality of site operation targets, wherein the site operation targets comprise the shortest task completion time, the highest task completion quality, the highest resource utilization rate, the shortest queuing time andthe most balance load; collecting tasks, personnel and resources in the site operation; randomly generating a plurality of populations according to the tasks, personnel and resources in the site operation; performing numbering of the tasks, personnel and resources in the populations, and generating a plurality of initial chromosome codes; and performing solution of the mathematic models corresponding to the targets according to a preset improved genetic algorithm and the initial chromosome codes, and obtaining an optimal solution as a site operation scheduling scheme. The method can achieve multi-target optimization of site maintenance, the algorithm process of target optimization is simple, and the efficiency of the site maintenance is improved.

Description

technical field [0001] The invention relates to the field of intelligent scheduling, in particular to an intelligent scheduling method for on-site operation and maintenance. Background technique [0002] The rapid development of power communication network requires continuous improvement of its operation and maintenance management level and efficiency, and puts forward more stringent requirements for power communication operation and maintenance management. On-site operation and maintenance is an important part of power communication operation and maintenance work, and the safety, quality and efficiency of its work are directly related to the effectiveness of power communication operation and maintenance work. At present, on-site operation and maintenance generally operate equipment through personnel technology, accumulated experience or long-term accumulated habits, which often lead to habitual violations or violations of safety operation regulations; at the same time, ther...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06Q10/00G06Q50/06G06N3/12
CPCG06N3/126G06Q10/04G06Q10/063118G06Q10/20G06Q50/06
Inventor 林密于祝芳陈龙洪杰陈明邓文成李博蔡文斌张阳吴伟明
Owner 海南电网有限责任公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products