Adaptive power generation optimal dispatching method for hydropower stations based on classification and classification of constraint conditions

A technology with constraints and optimized scheduling, applied in data processing applications, system integration technology, forecasting, etc., can solve the problems of high experience requirements of dispatchers, insufficient emergency response capabilities, low work efficiency, etc. The computer interaction scheduling process is friendly and the effect of reducing excessive requirements

Active Publication Date: 2021-11-05
福建华电福瑞能源发展有限公司古田溪水力发电厂 +1
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] In order to solve the deficiencies in the prior art, the present invention provides a hydropower station adaptive power generation optimization dispatching method based on the classification and classification of constraint conditions, which solves the problem of unsolvable problems, low work efficiency, and high labor intensity in the process of solving constraint optimization problems. , Insufficient emergency response capabilities when encountering emergencies, and high requirements for dispatchers' own experience

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Adaptive power generation optimal dispatching method for hydropower stations based on classification and classification of constraint conditions

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] Such as figure 1 As shown, taking the dynamic programming algorithm to solve the optimal dispatching model of hydropower generation as an example, when the benefit calculation is performed for a certain period of time and it is found that there is no solution for this period of time, check whether there is a relaxable scheduling constraint in this period. If there is a slackable scheduling constraint, relax the scheduling constraint with the lowest priority in this period, and recalculate the period benefit until there is a feasible solution space in this period. Only when all scheduling constraints have been relaxed and no feasible solution space can be found, the optimal scheduling problem is considered unsolvable. According to this method, it is recursively time-period until all time periods have been traversed, and then reverse recursively to obtain the optimal scheduling scheme. During the solution process, the relaxed constraints should be automatically recorded ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a hydropower station adaptive power generation optimization scheduling method based on the classification and classification of constraint conditions, which is characterized in that it includes the steps of: 1) establishing a hydropower station adaptive optimization scheduling model based on the classification and classification of constraint conditions, and the category of constraint conditions for optimal scheduling of hydropower stations Including physical constraints, scheduling constraints and boundary constraints; 2) Solve the adaptive optimal scheduling model of hydropower stations based on the classification and classification of constraints. The invention avoids the workload of dispatchers to repeatedly adjust trial and error, improves the compilation efficiency of power generation optimization dispatching plan; solves the problem that the traditional method relies too much on the dispatcher's own experience, and reduces the excessive requirements on the dispatcher's technical level; By making full use of the fast computing power of the computer, it is possible to quickly calculate the dispatching plan that best meets the dispatching intention; through model adaptive adjustment, the bad experience brought to dispatchers by "no solution to the problem" is reduced, and the human-computer interaction dispatching process is more friendly.

Description

technical field [0001] The invention relates to the technical field of optimal scheduling of power generation in hydropower stations, in particular to a method for optimal scheduling of adaptive power generation in hydropower stations based on classification and classification of constraint conditions. Background technique [0002] The optimal scheduling of hydropower generation is to find the optimal scheduling scheme that maximizes power generation or minimizes water consumption under given constraints, so as to achieve efficient use of water energy resources. Since the power generation process of a hydropower station itself involves three elements of water, machinery, and electricity, and also needs to take into account various types of comprehensive utilization requirements such as flood control, water supply, irrigation, and shipping, there are many constraints that need to be considered in the optimal dispatch of power generation, which is a multi-constraint Optimizati...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06
CPCG06Q10/04G06Q10/06312G06Q50/06Y02E40/70Y04S10/50
Inventor 叶子国芮钧林秉良殷召生林茂张金华卢秋生华涛胡少英
Owner 福建华电福瑞能源发展有限公司古田溪水力发电厂
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products