A Positioning Grouting Method for Large Tonnage Bearings
A large-tonnage, supporting pad technology, applied in construction, bridge construction, bridges, etc., can solve the problems of air bubbles, leakage ratio, hemp surface, etc. The effect of shortening the grouting time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] In order to make the purpose, technical solutions and advantages of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of them. the embodiment. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0024] figure 1 It is a flow chart of a large-tonnage support positioning grouting method according to an embodiment of the present invention, such as figure 1 shown, including:
[0025] S1, fixedly connecting a plurality of steel modules to enclose the grouting space for the positioning grouting of the large-tonnage support, and the lower end of the steel modules is arranged inside the support p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com