Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Alternate route configuration method for power communication service based on multiple constraints

A technology of power communication and configuration method, applied in the field of power communication network, can solve problems such as congestion, lack of clear instructions on how to choose the optimal solution, and uneven business distribution

Active Publication Date: 2020-10-30
GUIZHOU POWER GRID CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] Although Option 1 can comprehensively consider the time delay and risk factors of the power communication network, and effectively reduce the risk of the power communication network, the main route only considers the time delay factor, which will cause some links to carry too much business and cause congestion, making the business distribution Uneven, the network risk is greatly increased; Option 2 considers the intersection and reliability of the main and backup routes, and does not clearly explain how to choose the optimal solution when multiple constraints conflict; Option 3 also explains various constraint indicators , a set of methods for selecting the optimal route is given, but it does not reduce the risk of routing and also causes too much traffic to be carried by the optimal route

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Alternate route configuration method for power communication service based on multiple constraints
  • Alternate route configuration method for power communication service based on multiple constraints
  • Alternate route configuration method for power communication service based on multiple constraints

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0036] Such as figure 1 As shown, in the communication topology, the provincial power communication network spans multiple regions, may cross high-speed high-speed rail, and the types of optical cables are not uniform (OPWG / ADSS).

[0037] In order to solve the complicated practical factors in the power communication network, a maximum disjoint master-backup routing algorithm under multi-condition constraints is introduced.

[0038] Improved Bhandri Maximum Disjoint Primary-Backup Routing Algorithm

[0039] Based on the Bhandri algorithm, the existing literature proposes a maximum disjoint dual-route configuration method for the power communication network, but this algorithm is still based on Dijkstra as the main route, which is obviously unreasonable and will cause excessive local pressure on the power communication network. Therefore, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a multi-constraint-based backup route configuration method for power communication services, which belongs to the field of power communication networks. The method includes steps: S1: sort the routes that need to be allocated according to the service weights, so as to ensure that important services are allocated first; S2: select the top K optimal routes for the service based on the K-way shortest path algorithm, and then screen; S3: After the sorting is completed, select the first two routes, use the improved Bhandri maximum disjoint routing algorithm to select backup routes for the two routes, and then select the dual route with the smallest degree of intersection as the main and backup route for the service; S4: All business allocation is completed, End; otherwise, jump to step S2. The main route of the present invention can ensure the maximum service quality and reduce the channel pressure as much as possible, so that the channel pressure of the whole network can be balanced to a certain extent, and the backup route can be switched in time as a backup to ensure the minimum degree of intersection.

Description

technical field [0001] The invention belongs to the field of electric power communication networks, and relates to a method for configuring backup routes of electric power communication services based on multiple constraints. Background technique [0002] With the rapid development of smart grid, the power system presents the characteristics of increasingly frequent collaborative communication among multiple systems. The power system production department has also put forward higher requirements and standards for the power communication network. Therefore, in the smart grid, how to effectively reduce the security risk of power communication has become one of the problems that need to be solved urgently in the power system. Moreover, as the scale of the power system continues to expand, the current routing algorithm is difficult to meet the continuous improvement of demand. Therefore, improving the business service quality of the power communication network and further reduc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H04L12/24H04L12/707H04L12/733H04L12/735H04L45/122H04L45/128H04L45/24
Inventor 董武刘旭刘晴彭迪栎蔡诚陈登墀唐琪许强何翔聆李赟
Owner GUIZHOU POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products