Wind turbine generator set black start capability verification system and method

A wind turbine, black start technology, applied in wind power generation, electrical components, circuit devices, etc., can solve problems such as being susceptible to seasonal effects, and achieve the effect of ensuring system voltage quality and a wide range of applications

Inactive Publication Date: 2017-12-08
JIANGSU FRONTIER ELECTRIC TECH +2
View PDF1 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The traditional scheme of using hydropower stations and thermal power stations for electric field black start has the following limitations: the scheme of using hydropower stations for black start is easily affected by seasonality, and during the dry season in winter, there is often not enough water to support the black start of hydropower stations

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Wind turbine generator set black start capability verification system and method
  • Wind turbine generator set black start capability verification system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The following is based on Figure 1 to Figure 2 The specific embodiment of the present invention is further described:

[0033] A system for verifying the black start capability of wind turbines, including a small-capacity external power supply G 1 , wind turbine, SVG system, simulated load L 1 , matching load L 2 , box-type transformer T 1 , box-type transformer T 2 , load transformer T 3 and the cabin transformer T 5 , the external power supply G 1 It is connected with the wind turbine, and the wind turbine is connected with the box-type transformer T 1 connection, the box-type transformer T 1 Connected with busbar F 1 , the SVG system with bus F 1 connection, the simulated load L 1 with load transformer T 3 connection, the matched load L 2 with the cabin transformer T 5 connection, the load transformer T 3 and the cabin transformer T 5 Both and box-type transformer T 2 connection, the box-type transformer T 2 with busbar F 1 connection, the matched...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a wind turbine generator set black start capability verification system and method. The system comprises an external power supply G1, a wind turbine generator set, an SVG system, a simulation load L1, a matching load L2, a box type transformer T1, a box type transformer T2, a load transformer T3 and an engine room transformer T5. The external power supply G1 is connected with the wind turbine generator set. The wind turbine generator set is connected with the box type transformer T1. The box type transformer T1 is connected with a bus F1. The SVG system is connected with the bus F1. The simulation load L1 is connected with the load transformer T3. The matching load L2 is connected with the engine room transformer T5. The load transformer T3 and the engine room transformer T5 are connected with the box type transformer T2. The box type transformer T2 is connected with the bus F1. The matching load L2 is connected with an energy management system. The wind turbine generator set is connected with the energy management system through a wind turbine generator monitoring system. The real black start is simulated so as to verify the black start capability of the wind turbine generator set.

Description

technical field [0001] The invention relates to the field of electric field black start, in particular to a system and method for verifying the black start capability of a wind turbine. Background technique [0002] Black start means that after the entire power grid is out of service due to external or internal faults and enters a completely black state, it does not rely on the help of the external power grid, only by starting the power supply with black start capability inside the power grid, and then driving to restore the power supply without black start capability in the power grid. Gradually expand the recovery scope of the system, and eventually achieve the restart of the entire grid. [0003] For the black start problem of the power system, traditional black start power sources include hydropower stations and thermal power stations. However, with the aggravation of energy crisis and environmental problems and the widespread use of new energy, it is a strategic plan t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/38H02J3/06
CPCH02J3/06H02J3/386H02J3/388Y02E10/76
Inventor 徐钢徐妍杜先波蒋琛顾文李辰龙储海军杨宏宇唐一铭刘亚南王琦谭敏刚
Owner JIANGSU FRONTIER ELECTRIC TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products