A landing priority scheduling method based on elevator outbound call system
A priority scheduling and priority technology, applied in transportation, packaging, elevators, etc., can solve the problems of unallocated, reverse cut off, unreasonable elevator route planning, etc., to reduce use failures, reduce time costs, The effect of improving the efficiency of the elevator
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] refer to Figure 1 to Figure 3 , a landing priority scheduling method based on the elevator outbound call system. In the model established by this method, the running sequence of the elevator is divided into multiple steps with successively lower priorities; the lowest priority step is the base state of the actual floor station, The rest of the order is the excited state corresponding to the virtual floor station in the transition space. The order with low priority satisfies the transition condition and transitions to the order with high priority. The number of missed times C of the landing, the waiting time T of the landing, the weight coefficient X of the number of people in the waiting hall, the weight coefficient Y of the number of missed times, and the weight coefficient Z of the waiting time. The elevator is in the priority order of the steps Passengers are carried sequentially.
[0018] The number of people N in the hall of the landing is collected by the eddy c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com