Construction method of precise intersecting drainage holes in coal mine underground roadway
A technology of underground roadway and construction method, which is applied in the direction of drainage, mining equipment, earthwork drilling and mining, etc., can solve the problems of long cycle, high cost of roadway excavation, heavy pollution, etc. The effect of labor intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings and examples. The following examples are only used to illustrate the technical solutions of the present invention more clearly, but not to limit the protection scope of the present invention.
[0035] see Figure 1 to Figure 5 , shows the construction method of the coal mine underground roadway precisely crossing drainage holes of the present invention.
[0036] The method for constructing precisely opposite drainage holes in underground coal mine roadways includes the following steps:
[0037] Step 1: Drilling preparation, determine the inclination angle and azimuth angle of the drilling hole, among which, the drilling construction design can be carried out according to the drainage requirements of the working face, geological data and precise drilling hole layout requirements to determine the inclination angle and azimuth angle of the dril...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com