Resistance changing agent for changing soil resistance
A technology of soil resistance and resistive agent, which is applied in the direction of conductive materials, circuits, electrical components, etc. dispersed in non-conductive inorganic materials, and can solve problems such as poor resistance reduction ability, change of soil resistivity, soil pollution, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1-18
[0063] Embodiment 1-18. No. 1-18 resistance modifying agent of the present invention and its application effect
[0064] Embodiment 1-18 provides multiple specific formulations of the conductive anticorrosion coating described in the protection scope of the present invention, as shown in Table 1 below, in the table, each raw material component, the composite powder preparation of each raw material component, and water are all In parts by weight.
[0065]
[0066]
[0067] In all the above embodiments, the application steps of the resistance modifying agent include: selecting the soil area to be tested, and measuring the soil resistance of the area; after mixing the above-mentioned raw materials and components according to the corresponding weight ratio, Pour into the above soil area, and measure the soil resistance again after 24 hours;
[0068] The performance test method of described resistance changing agent is as follows:
[0069] When the resistance-modifying agen...
Embodiment 19
[0073] Example 19, using the resistance-modifying agent of the present invention to improve soil resistance
[0074] This embodiment provides a method for changing soil resistance, such as figure 1 shown, including the following steps:
[0075] Dig the trench; set up the grounding device; according to the soil type, select a resistance-modifying agent formula in Examples 1-18, mix all the raw materials to obtain a composite powder preparation, and fill and pour the composite powder preparation And / or scattered in the soil; backfill the soil after 24 hours; the grounding device can be the grounding pole 2 and / or the grounding module 3 .
[0076] Alternatively, after obtaining the composite powder preparation, mix 6-40 parts by weight of the above-mentioned composite powder preparation with 40-100 parts by weight of water, then perform the filling, pouring and / or spreading, and finally backfill the soil.
[0077]After 24-48 hours of filling the soil with resistance modifying a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com