Base line-based subway tunnel horizontal displacement deformation monitoring method
A technology of horizontal displacement and deformation monitoring, applied in the field of surveying and mapping science, can solve the problems of unreliable deformation monitoring results, erroneous deformation monitoring results, rear crossing errors, etc. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] Such as figure 1 and 2 As shown, a baseline-based monitoring method for horizontal displacement and deformation of subway tunnels includes the following steps:
[0021] (1) Set up the total station, and use the total station to collect the coordinate data of the two control points. The total station is set up between the two points, and the observation values of the control points A and B in each period are the plane coordinates: and Among them, the subscript j=1,2 indicates the test period number;
[0022] (2) Calculate the two-period control baseline vectors according to the coordinates of the control points Among them, the subscript j=1,2 indicates the test period number;
[0023] (3) Establish a baseline coordinate system according to the control baseline vector;
[0024] (4) Use the total station to collect the plane coordinate data P of the two monitoring points ij (x ij ,y ij )i=1,2,...,n, j=1,2, where n is the number of monitoring points, and j is t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com