Intelligent substation design scheme comprehensive assessment method
A technology of intelligent substation and design scheme, applied in the field of power system, can solve the problem of low credibility of evaluation results, and achieve the effect of scientific evaluation results and comprehensive evaluation of safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] A comprehensive evaluation method for a smart substation design scheme, the method includes the following steps:
[0043] a. Determine the m smart substation design schemes participating in the evaluation, and select the kth smart substation design scheme, k=1, 2, ..., m;
[0044] b. In the kth smart substation design scheme, determine the one-time input cost C i and maintenance cost C m , the set of all transformers in the kth smart substation is A, and the no-load loss of the ath transformer in A is determined to be P a0 and the load loss is P ak and the load rate ρ, the outgoing line set of the kth smart substation is S, and the expected fault-blocked electric quantity EENS of the γth outgoing line in S is determined γ , determine the electricity price σ in the area where the kth smart substation is located, the equivalent electricity price of unplanned power outages δ=10σ, the annual interest rate i, the year of capital investment j and the whole life cycle of th...
Embodiment 2
[0071] Taking the design scheme of a 220kV smart substation as an example to conduct a comprehensive evaluation of safety, efficiency and economy. Isolate the circuit breaker. The specific design scheme is as follows:
[0072] (1) Main transformer: 1 in the current phase and 3 in the final phase. 240MVA in this phase, 3×240MVA in the end, three-phase three-winding oil-immersed self-cooling high-impedance on-load tap-changing transformer, the voltage level is 220 / 110 / 10kV;
[0073] (2) 220kV outgoing line: 1 round in this period, 6 rounds in the final period;
[0074] (3) 110kV outgoing line: 3 times in this period, 12 times in the final period;
[0075] (4) 10kV outgoing line: 9 times in this period, 24 times in the final period;
[0076] (5) Electrical main wiring: 220kV outgoing line 1 time in the current period, 6 times in the final period, 220kV electrical main wiring terminal, this period adopts double busbar wiring; 110kV outgoing line 3 times in the current period, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com