Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Traffic jam time calculation method for transition road segment

A technology of congestion time and calculation method, applied in the field of urban traffic informatization, which can solve problems such as no early warning, poor accuracy, and rear-end collisions, etc., to achieve the effects of ensuring reliable operation, simple calculation process, and alleviating congestion

Inactive Publication Date: 2017-01-11
ANHUI SUN CREATE ELECTRONICS
View PDF5 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The unified speed limit or the fixed installation of speed limit signs not only greatly reduces the operating efficiency of the original viaduct that should operate efficiently, but also makes it easier for the vehicle in front to see the speed limit sign and suddenly slow down, which in turn causes rear-end collisions, etc. problems, resulting in driving safety can not be effectively guaranteed
Using video surveillance to timely judge the traffic congestion of urban roads has many shortcomings such as low early warning efficiency, poor accuracy, and even no early warning.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Traffic jam time calculation method for transition road segment
  • Traffic jam time calculation method for transition road segment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0115] In the upstream section of the transition section from the exit ramp of a certain expressway to the main road in Hefei (one-way 6 lanes, expressway), the section of the transition section (one-way 4 lanes, expressway), and the downstream section (one-way 4 lanes, main road) Roads) are respectively equipped with a radar detector.

[0116] Set its sampling period to 5 minutes, and write a program using the stored procedure according to the following formula to calculate Q in real time from the data acquired by the radar detector 1 , Q 3 .

[0117] Q i =∑q i *60 / 5=12∑q i

[0118] By analogy, the cross-sectional flow Q of the upstream section and downstream section of the transition section 1 , Q 3 The data is stored in the corresponding database in the order of the sampling period.

[0119] The single-lane design capacity of the transition section is 1,200 vehicles / h, and the one-way 4-lane design capacity is 4,800 vehicles / h.

[0120] Q r is the maximum traffic ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of urban transportation informatization, and particularly relates to a traffic jam time calculation method for a transition road segment. The method comprises the following steps that 1, a radar detector is installed and debugged; 2, the section flow of the upstream segment and the section flow of the downstream segment are acquired; 3, the traffic capacity of the transition road segment is calculated; 4, the queuing duration time is calculated; 5, the queuing dispersing time is calculated; 6, the traffic jam time is calculated. By means of the method, a traffic commanding center can remind a driver to reasonably set the car speed or reselect a travel route in advance, and then the maximum traffic capacity of the transition road segment is achieved on the premise that safe operation of the transition road segment is guaranteed. Even different emergency measures can be taken according to the different traffic jam times, so that reliable running of a whole traffic system in daily operation is guaranteed.

Description

technical field [0001] The invention belongs to the technical field of urban traffic informatization, and in particular relates to a traffic jam time calculation method for a transition road section. Background technique [0002] With the rapid development of social economy, the continuous growth of population and the gradual improvement of people's living standards, the number of motor vehicles in my country is also increasing at an unprecedented speed. The huge number of motor vehicles makes urban roads and their traffic facilities overwhelmed, and local or even large-scale traffic jams often occur. From the perspective of the space where traffic congestion occurs, urban road traffic congestion often starts from a certain intersection in the road network. The queuing tends to spread further upstream and even extend to the upstream intersection, and vehicle queuing overflow may occur. The above-mentioned congestion phenomenon is especially frequent at the transition secti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G08G1/052G08G1/065
CPCG08G1/052G08G1/065
Inventor 邹娇孙晓静吴亚峰林家骐董婉丽杨灿邹倩
Owner ANHUI SUN CREATE ELECTRONICS
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products