A brick gap filling device for a city municipal sidewalk floor tile laying robot
A technology for brick gap filling and sidewalks, which is applied in the field of brick gap filling devices for floor tile laying robots in urban municipal sidewalks. Fixed, high work efficiency, increase the effect of jitter
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific illustrations.
[0013] Such as figure 1 and figure 2 Shown, a kind of urban municipal sidewalk floor tile laying robot is used brick seam mud filling device, comprises mud filling support 61, mud filling turntable 62, telescopic bracket 63, locking cover 64, mud filling elevating rod 65, vibrating extension spring 66, vibrating Bearing 67, mud-filling slider 68 and mud-filling drain basket 69; mud-filling support rods are arranged at the four corners of the lower end of the mud-filling support 61, and an installation platform is arranged at the upper end of the mud-filling support 61, and a mud-filling turntable 62 is fixed on the central position of the installation platform at the upper end of the mud-filling support 61, and the rear end of the telescopic s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com