Method for Calculating Dynamic Reserves of Fracture-vuggy Reservoirs
A technology of dynamic reserves and fracture-vug type, applied in calculation, data processing applications, instruments, etc., can solve the problems of reservoir space division, time and economic loss, poor accuracy, etc., achieve accurate reservoir scale, avoid particularity, The effect of high accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] A method for calculating the dynamic reserves of a fractured-vug reservoir according to the present invention comprises the following steps:
[0018] S01: Bottom-hole crude oil density ρ for the first pressure measurement 1 ;
[0019] S02: The oil well is developed for a period of time, and the cumulative oil production during the period is recorded as N p ;
[0020] S03: The density of crude oil at the bottom of the second pressure measurement ρ 2 ;
[0021] S04: The measured ρ 1 , ρ 2 and N p Substitute into formula (1) to obtain the dynamic reserves of fractured-vuggy reservoirs.
[0022]
[0023] The bottom hole crude oil density parameter ρ involved in formula (1) 1 , ρ 2 Respectively through the derivation of (2) to obtain
[0024]
[0025] Among them, P 底 is the bottom hole crude oil pressure, P r is the reference point crude oil pressure, H 底 is the bottom depth, H r is the reference point depth. The closer the selected reference point is to...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com