Calculation method of lifting amount of low embankment top surface of ballastless track under expansion and contraction of expansive soil foundation
A ballastless track, calculation method technology, applied in the direction of road, calculation, track, etc., can solve the problem of unclear transmission mechanism and so on
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0067] refer to figure 1 , The subgrade filling heights of the expansive soil foundation (medium-strong expansion potential) under the low embankment of Yungui Railway are 0.9, 1.9, and 2.7m respectively, the subgrade top surface width is 7.8m, and the side-slope ratio is 1:1.5. Settlement slabs are arranged in the center of the subgrade on the top of the embankment and the left (right) shoulder, and soil moisture measuring tubes are arranged in the center of the left (right) line in the foundation. January 1), the natural dry shrinkage period (September 2, 2013-May 24, 2014), and the natural rainy season (May 24, 2014-July 12, 2014).
[0068] figure 1 Among them, 1 represents the sand hole, 2 represents the sand tank, 3 represents the sand cushion, 4 represents the embankment body, 5 represents the composite geomembrane, 6 represents the soaking ditch, 7 represents the soil moisture measuring tube, and 8 represents the settlement plate.
[0069] The following is the calcula...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com