Hydropower station optimized operation control method and system

A control method and a technology for optimizing operation, which can be applied to control system purposes, hydroelectric power generation, and control multiple engines at the same time, and can solve problems such as high labor cost investment, high cost, and high equipment cost

Active Publication Date: 2016-08-17
HNAC TECH
View PDF3 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The current meter method can easily measure the flow velocity value of each measuring point of the water passing section, but the workload of the early installation and later data processing is large, and the labor cost investment is high; the volute differential pressure method is simple to operate but difficult to calibrate the flow coefficient It is difficult to guarantee; the ultrasonic flow measurement method can directly measure the flow rate, and it is easy to install and operate, but the real-time measurement of the flow rate by a fixed-installed ultrasonic flowmeter requires high equipment costs. Therefore, it is difficult to measure the flow rate in the characteristic curve in real time and the cost is high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hydropower station optimized operation control method and system
  • Hydropower station optimized operation control method and system
  • Hydropower station optimized operation control method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0093] like figure 1 As shown, a hydropower station optimization operation control method, including:

[0094] S10: Obtain the water head-guide vane opening-unit output curve corresponding to the hydropower unit.

[0095] Through the experiment on the hydropower unit, the corresponding water head-guide vane opening-unit output curve of the hydropower unit is obtained. The head-guide vane opening-unit output curve includes static head-guide vane opening-unit output curve or net water head-guide vane opening-unit output curve.

[0096] Hydropower stations can be divided into unit water supply hydropower stations and combined water supply hydropower stations. Unit water supply hydropower station, that is, one water diversion pipe for each unit, such as figure 2 As shown, the water flowing through the turbine in the hydropower station is connected to the turbine through the diversion pipe. The water head, the opening of the guide vane, and the flow through the unit are determi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a hydropower station optimized operation control method and system. The hydropower station optimized operation control method comprises the steps that a curve of a water head, the guide vane opening angle and the unit output is obtained, and the water head corresponds to a hydropower station unit, and a constant flow model or a constant load model is built according to the curve of the water head, the guide vane opening angle and the unit output; the constant flow model or the constant load model is solved so as to obtain a unit work control scheme; and operation of a hydropower station is controlled according to the control scheme. According to the hydropower station optimized operation control method, the actual curve of the water head, the guide vane opening angle and the unit output is obtained through in-situ experimental operation, and the mathematic model is built according to the curve, so that the obtained control scheme can meet the in-situ unit characteristics better; accordingly, the error is reduced, optimized operation of the hydropower station is achieved, and the guide vane opening angle, the unit output and other data can be used through data in existing unit automation control systems; and the cost is low, and the software cost and the hardware cost do not need to be additionally increased.

Description

technical field [0001] The invention relates to the field of unit control of a hydropower station, in particular to a method and system for optimal operation control of a hydropower station. Background technique [0002] The economic optimization operation of the hydropower station is mainly to ensure the stable operation of the power station unit in the high efficiency area. That is to study the optimal number, combination and start-stop sequence of working units in the hydropower station under given conditions, and the optimal distribution of load among units. [0003] The existing economic optimization operation in the hydropower plant is mainly based on the hydro turbine model test data provided by the manufacturer to convert and draw the dynamic characteristic curve of the unit section, construct a constant flow or constant load optimization mathematical model, and use traditional algorithms such as dynamic programming or equal micro-increase rate or Artificial intelli...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F03B15/00H02J3/38
CPCF03B15/00F05B2270/111H02J3/00H02J3/382H02J2203/20Y02E10/20
Inventor 杨威袁江锋陈晓倪红波康明卫张良
Owner HNAC TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products