Oil reservoir engineering calculation method for determining reasonable oil reservoir liquid yield
A technology for engineering calculation and fluid production, which is used in surveying, earth-moving drilling and production, wellbore/well components, etc. It can solve the problems of not considering the integrity of the injection-production system, not considering the degree of well pattern matching, and long time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] The method for determining the reasonable liquid production rate of the reservoir includes the following steps:
[0062] Step 1, calculating the reasonable minimum bottomhole flowing pressure of the reservoir production well;
[0063] Step 2, calculating the reasonable water injection pressure of the water injection well;
[0064] Step 3, calculating the water absorption capacity and fluid production capacity of the reservoir;
[0065] Step 4, calculating the reasonable liquid production rate of the reservoir.
[0066] In order to make the above and other purposes, features and advantages of this embodiment more obvious and easy to understand, the following will introduce the specific process of reservoir engineering methods to determine the reasonable liquid production rate of the reservoir in combination with the technical principles, and at the same time give a better experimental example, and cooperate with the The attached tables and formulas are described in det...
experiment example 2
[0140] Taking Shengtuo Oilfield as an example, the invented technique for determining reservoir engineering with reasonable liquid production was applied to typical units of different sedimentary reservoirs (fluvial facies and delta facies sediments) in Shengli Oil Production Plant: (1) Shaer 9 in Shenger District ~10 units, this unit belongs to the delta facies pure water flooding unit, and it is feasible to restore the pressure of the current well pattern
[0141] Attached Table 1 Calculation Table of Reasonable Liquid Production in Units 9-10 of Sha 2, Sheng 2 District
[0142]
[0143] The optimal and reasonable formation pressure should be restored to 15.3MPa (pressure drop restored to 2.2MPa), and the average single well daily fluid should be reduced from the original 58m 3 / d increased to 200m 3 / d. By the end of 2015, the recovery rate will increase by 5.0%, and the recoverable reserves will increase by 17.7×10 4 t. The pressure is restored after the stratificat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com