Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Electric power material supply whole-course early-warning supervise system and method

A power material, whole process technology, applied in the field of early warning and supervision system based on power material supply, can solve problems affecting the operation efficiency of power material supply chain, construction loss of power engineering projects, lack of active early warning mechanism, etc., to achieve rich functions and material supply. Timely and practical results

Inactive Publication Date: 2016-05-25
STATE GRID SHANDONG ELECTRIC POWER
View PDF4 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, the ERP system of the power company meets the needs of routine business processing, and the business process of the material supply chain can be standardized. However, there is a lack of active warning mechanism among the various business links in the supply chain, and the work can only be completed on time by human consciousness. The delay may lead to the delay of the overall work, which in turn affects the operation efficiency of the power material supply chain, resulting in untimely and inaccurate supply, which will bring huge losses to the construction of power engineering projects

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric power material supply whole-course early-warning supervise system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0034] Such as figure 1 As shown, an implementation method based on the whole-process early warning and supervision of power material supply includes the following steps:

[0035] (1) Use ABAP to regularly collect and summarize the entire business process, drawings, inventory, and contract resource information data of the ERP system, and automatically collect the data to the data center in an incremental or full manner through Oracle tasks;

[0036] (2) After the data center receives the data, it cleans the data, unifies the data format, deletes duplicate values, processes missing data, and checks the accuracy of the data.

[0037] (3) By setting the early warning threshold for the key nodes of power material supply, corresponding processing is carried out through different business logics. For the business processing nodes close to the threshold, the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an electric power material supply whole-course early-warning supervise system and method. The system is composed of an ERP system, a data center and a business system. The ERP system connected with the data center collects information data of a whole business process, a drawing, an inventory, and contract resources of a master ERP system regularly; the data center is used for gathering and analyzing all available resources and providing a data support for whole-course early warning of the material supply; and the business system is used for setting an early-warning threshold value, displaying all monitoring early-warning and early-warning supervision information. An early-warning threshold value is set for an electric power material supply key node and corresponding treatment is carried out according to different business logics; for a business processing node close to the threshold value, the analyzed data are sent to a user for prompting; and a corresponding chart is generated at a client. According to the invention, analyses on business tracking and monitoring early warning of an information management and control node of an electric power material supply chain are realized; and thus the electric power material supply chain can be tracked and monitored conveniently.

Description

technical field [0001] The invention relates to a whole-process early warning and supervision system and method based on power material supply. Background technique [0002] At present, the ERP system of the power company meets the needs of routine business processing, and the business process of the material supply chain can be standardized. However, there is a lack of active warning mechanism among the various business links in the supply chain, and the work can only be completed on time by human consciousness. The delay may lead to the delay of the overall work, which in turn affects the operation efficiency of the power material supply chain, resulting in untimely and inaccurate supply, which will bring huge losses to the construction of power engineering projects. Contents of the invention [0003] In order to solve the above problems, the present invention proposes a whole-process early warning and supervision system and method based on power material supply. The sys...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06312G06Q50/06
Inventor 钱昆张世伟蒋瑞金卢国筠陈峰沈洪涛曹刚吴金刚郑慧林杨青山徐新源霍艳霞
Owner STATE GRID SHANDONG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products