Electric power engineering project management system

A project management system and electric power engineering technology, applied in data processing applications, instruments, calculations, etc., can solve problems that affect the normal implementation of projects, scattered management, and inability to carry out close and efficient work connection

Inactive Publication Date: 2016-02-03
STATE GRID CORP OF CHINA +3
View PDF5 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, in the current process of managing power engineering projects, each management department cannot fully grasp the relevant information of the current project. Management efficiency affects the normal implementation of the project

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric power engineering project management system
  • Electric power engineering project management system
  • Electric power engineering project management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0046] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0047] The embodiment of the present invention discloses a power engineering project management system, see figure 1 As shown, the system includes:

[0048] The project information acquiring device 11 is used to receive the project information related to the power engineering construction project sent by the front-end user of the system, and store the acquired project information in the project information database;

[0049] The project information management p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The application discloses an electric power engineering project management system, including a project information obtainment device and a project information management platform. The project information obtainment device is used for receiving project information related to an electric power engineering construction project and sent by a system front user, and storing the obtained projection information into a project information database. The project information management platform is used for receiving a project management instruction sent by a project manager and managing corresponding project information stored in the project information database according to the project management instruction. The system uniformly collects the project information sent by the system front user and then uniformly manages the previously-stored projection information based on the project management instruction sent by the project manager, so that each management department is enabled to fully master current project information and to uniformly manage the project, thereby improving the project management efficiency.

Description

technical field [0001] The invention relates to the technical field of project management, in particular to a power engineering project management system. Background technique [0002] With the development of social construction, people's demand for power engineering projects such as power grid construction continues to increase. The whole process of a power engineering project from the beginning to the end usually includes many links such as project establishment, filing, design, approval, construction, material management, acceptance and settlement. In order to ensure the smooth progress of the project, it is necessary to carry out unified management of the above-mentioned many links . [0003] However, in the current process of managing power engineering projects, each management department cannot fully grasp the relevant information of the current project. Management efficiency affects the normal implementation of the project. [0004] From the above, it can be seen t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
Inventor 赵逸人陈雷姜志勇叶铁丰
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products