Appointment and schedule control system used for building elevator
A scheduling control and elevator technology, applied in the field of elevator control, can solve problems such as short distances between human bodies, achieve stable and reliable transmission, and improve operating efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] Embodiments of the present invention will be described below in conjunction with the accompanying drawings.
[0019] like figure 1 As shown, the present invention designs a reservation and scheduling control system for building elevators, including a scheduling control mechanism and a mobile terminal, and the scheduling control mechanism includes an instruction generation circuit, a storage circuit, a main control circuit, a GSM communication circuit, a data Extraction circuit, data analysis circuit, driving circuit; the instruction generating circuit is used to sequentially generate control instructions according to the number of floors; the storage circuit is used to store control instructions and establish a matching mobile terminal number; the main control circuit, Used to generate a first control signal; the GSM communication circuit is used to send a control instruction to a matched mobile terminal and receive feedback data from the mobile terminal according to th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com