Foundation correcting or lifting adjusting method
An adjustment method and basic technology, applied in infrastructure engineering, construction, etc., can solve problems such as unstable ground settlement, uneven settlement of structural supports/columns, and inclined deformation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] Please combine figure 1 with figure 2 Let's understand the basic deviation correction or lifting adjustment method of Embodiment 1 of the present invention. Such as figure 1As shown, the foundation involved in the present invention includes one or more foundation piers 1 (only one foundation piers are shown in the figure), and the foundation piers 1 are supported with structural supports or columns 2 . figure 1 The foundation pier 1 in the figure is not tilted, but it may be tilted due to uneven settlement of the foundation in practice. This embodiment takes the situation when it does not tilt as an example for illustration.
[0054] The basic deviation correction or lifting adjustment method of the present invention comprises the following steps:
[0055] Step 1: Excavating around the foundation pier 1 to form a foundation pit for construction. Or excavate around the entire foundation to form a foundation pit that is convenient for construction.
[0056] Step 2, ...
Embodiment 2
[0068] Such as image 3 with Figure 4 As shown, compared with Embodiment 1, in Embodiment 2, the first platform beam 32 is used to replace the platform pier 3 in Embodiment 1, wherein the first platform beam 32 is a strip beam, and the two strip beams 32 relatively parallel settings. Obviously, the scheme of using beams instead of piers is completely feasible, but the scheme of using beams requires a large amount of construction, but using beams instead of piers has a larger foundation area and heavier weight, which can improve its stability.
Embodiment 3
[0070] Such as Figure 5 As shown, the difference between the third embodiment and the second embodiment is that the first adjusting beam 40 is used to replace the adjusting pier 4 in the second embodiment. The effects of the two are similar, except that the amount of construction increases, but the structural strength of the first adjusting beam 40 is greater than that of the adjusting pier 4, so as to drive the pier 1 up and down.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com