Geomagnetic storm disaster prevention method for a section of buried oil and gas pipeline
A technology for oil and gas pipelines and geomagnetic storms
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0054] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. The following description is only for demonstration and explanation, and does not limit the present invention in any form.
[0055] In order to reduce the sudden change point of pipeline geomagnetic storm disaster and reduce the "swallow tail peak" of pipeline PSP, thereby reducing the number of pipeline cathodic protection devices, and in order to reduce the degree of sudden change of PSP at pipeline geomagnetic storm disaster sudden change point, thereby greatly saving pipeline anti-corrosion costs, Improve the ability of buried oil and gas pipelines to defend against geomagnetic storm disasters, prolong the life of pipelines and related equipment, and design a method for preventing geomagnetic storm disasters for a section of buried oil and gas pipelines, such as figure 1 As shown, the method mainly includes the following four basic principle...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com