A technology for fast calculation and power generation, applied in computing, instrumentation, data processing applications, etc., it can solve the problems of limited application scenarios, the relationship between power generation cannot be directly described, and the workload is large, so as to achieve a wide range of application scenarios and improve the evaluation index system. , the effect of fast calculation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The purpose of the present invention is achieved like this: a kind of method for quick calculation hydropower generating capacity comprises the following steps:
[0028] Step 1, select the historical 90-year runoff series of a certain hydropower station; that is, the average inflow flow of the hydropower station in the 90-year history; some values are shown in Table 1:
[0029] Table 1 is the runoff series of a certain hydropower station in the past 90 years (excerpts)
[0030] time
1920
1921
1922
1923
1924
1925
1926
1927
1928
1929
1930
early January
140
140
190
170
180
120
150
180
130
150
160
mid-january
130
130
180
140
150
120
130
170
130
140
160
late January
130
130
170
130
150
110
130
180
120
130
160
early February
130
120
190
130
150 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com