Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Mine digital production control system and method

A management and control system and mine technology, applied in mining equipment, mining equipment, earthwork drilling and mining, etc., can solve problems such as difficult management, poor connection before and after operation, scattered production documents and data, etc., and achieve recovery rate and concentrate grade The effect of maintaining stability, standardizing the overall production technology management, and reducing the interference of human factors

Active Publication Date: 2017-08-01
CHINA GOLD INNER MONGOLIA MINING
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The existing geological model is relatively simple, and it is difficult to meet the accurate geological conditions required by the mining stripping plan and mining design; the management methods of the production site are simple and scattered, and the mining production management has always adopted the management method of human supervision, which is difficult to manage; the annual production plan, Yearly and monthly mining and stripping construction plans and ore block mining design and management operations are not well connected before and after operation, and related mining operations and on-site management can only be completed by human experience, overall planning and strengthened supervision; the design workload is heavy and the tools are simple mining software And drawing software Cad, there are human interference factors and low work efficiency; production files and data are scattered and not centralized
[0004] Due to the wide range of mining pit operations and the large number of operating equipment and personnel, the management personnel have limited supervision over mining operation technology and safety, and cannot monitor the overall production of the stope and the shoveling of a single shoveling equipment in real time, thus affecting the dilution rate , loss rate management and fluctuations in ore supply grades

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Mine digital production control system and method
  • Mine digital production control system and method
  • Mine digital production control system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0061] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. The components of the embodiments of the invention generally described and illustrated in the drawings herein may be arranged and designed in a variety of different configurations. Thus, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the invention as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work fall within the protection scope of the present invention.

[0062] like figure 1 A mi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention discloses a mine digitlization production management and control system and method. The present invention provides a mine digital management and control system and a digital management and control method applied to the system. The management and control system comprises a geological resource analysis subsystem, an ore blending subsystem and a management and control subsystem; the geological resource analysis subsystem generates a geological resource module according to acquired geological samples; the ore blending subsystem automatically generates an ore blending scheme; and the management and control subsystem monitors, adjusts and manages mine work in real time according to the geological module and the ore blending scheme. The method comprises the steps of generating the geological resource module after analysis, simulation and prediction according to the acquired geological samples; automatically generating the ore blending scheme according to the geological resource module; and monitoring, adjusting and managing the mine work in real time according to the geological module and the ore blending scheme. The system and method manage and control mining production on the basis of geological base data, so that the ore blending result is more accurate, mining work precision and efficiency are improved, mining loss dilution rate is reduced, and efficient work management is achieved.

Description

technical field [0001] The invention relates to the field of digital management and control, in particular, to a method and system for digital management and control of mines. Background technique [0002] For large open-pit deposits, the annual mining and stripping volume is large, the daily ore volume is large, there are many shovel loading equipment and transportation equipment, and there are many operating sites and wide areas, which are difficult to manage. high demands. [0003] The existing geological model is relatively simple, and it is difficult to meet the exact geological conditions required by the mining and stripping plan and mining design; the production site management methods are simple and scattered, and the mining production management has always adopted a management method based on human supervision, which is difficult to manage; the annual production plan, The annual and monthly mining and stripping construction plans and the mining design and managemen...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21F17/18
Inventor 孙静高占义张光胜李韦华冯瑞陈虹姜昭晖
Owner CHINA GOLD INNER MONGOLIA MINING
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products