Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Bored pile concrete interface monitoring device and method

A technology of bored piles and poured concrete, which is applied in the testing of basic structures, construction, and basic structure engineering, etc., can solve the problems of large waste, increase the difficulty of foundation excavation, and poor accuracy, so as to solve the problem of environmental pollution and reduce the The effect of project construction cost and installation is simple and easy to operate

Inactive Publication Date: 2015-05-20
HUBEI CENT SOUTH EXPLORATION & FOUND ENG +1
View PDF5 Cites 31 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Because there is a mixture of mud above the concrete pouring surface, it is difficult to correctly position and control the real elevation of the concrete surface being poured. In the past engineering construction, the method of estimation was often used. In order to ensure the reliability of the pouring volume, the concrete pouring volume was often caused increase
It is especially obvious in the construction process of high-rise building foundation bored piles. Each pile often needs to be poured 2 to 4m more. On the one hand, it causes a serious waste of concrete resources and increases the difficulty of foundation excavation. On the other hand, it increases the project cost. construction cost and project construction cost, and brought about the environmental pollution problem of how to bury and dispose of excess concrete waste blocks
If the estimate is insufficient, the concrete pouring interface will be insufficient, which will affect the quality of the foundation project
[0004] How to control the pouring interface of concrete underwater to meet the requirements of the designed pouring interface in underwater concrete pouring? There is no corresponding monitoring method in China, and there are no special monitoring instruments and equipment. The estimation method is extremely inaccurate , the waste is large or the quality cannot be guaranteed; there is no special monitoring instrument or equipment in the world

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bored pile concrete interface monitoring device and method
  • Bored pile concrete interface monitoring device and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The following is attached figure 1 with 2 And specific embodiment the present invention is described in further detail:

[0029] The invention is mainly used for monitoring the concrete interface during pouring of cast-in-situ pile holes in large-scale foundation projects such as high-rise buildings, bridges, port terminals, offshore oil production platforms, and nuclear power plants.

[0030] In the present invention, the test method and sensitivity test analysis of electrical impedance physical properties of concrete, mud, water and other media in the process of underwater concrete pouring of bored piles, and the test of underwater electrical impedance test probes and underwater concrete pouring elevation positioning Research on methods and testing instruments, proposed a method for testing the interface of bored piles' underwater concrete elevation and developed a device for monitoring the interface of bored piles. The key technical principle of the device is that ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a bored pile concrete interface monitoring device which is designed through an electrical impedance physical property testing method for media such as concrete, slurry and water in the bored pile underwater concrete pouring process and sensitivity test analysis and through researches on the testing method and instrument for an underwater electrical impedance testing probe and underwater concrete pouring elevation positioning. The bored pile concrete interface monitoring device comprises a ground host, a probe electronic cavity, a push rod arranged on the top of the probe electronic cavity, an insulation rod arranged at the bottom of the probe electronic cavity, a first electrode, a second electrode, a resistance value measuring module and an analog-digital converter, wherein the first electrode and the second electrode are fixedly connected to the insulation rod in a sleeving mode, and the resistance value measuring module and the analog-digital converter are arranged in the probe electronic cavity. According to the key technological principle, in the pouring process of a pouring hole, the electrical impedance of water and slurry is obviously different form that of the concrete, and the positioning of the concrete pouring interface (or depth) is achieved by measuring the difference.

Description

technical field [0001] The invention relates to the technical field of underwater concrete pouring of bored cast-in-place piles in basic construction engineering, in particular to a device and method for monitoring the concrete interface of bored cast-in-place piles. Background technique [0002] With the vigorous development of engineering construction in my country, cast-in-situ pile foundation engineering is widely used in large-scale projects such as high-rise buildings, bridges, port terminals, offshore oil production platforms, and nuclear power plants, and has become the most important form of foundation engineering in engineering construction. The wide use of cast-in-situ pile foundation projects and the increase of pile depth have increased the amount of concrete pouring. According to relevant statistics, most of the concrete pouring fields are below ±0.00, such as high-rise building foundations and underground caverns. , Underground tunnels, bridges, ports, docks a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D33/00
Inventor 祝世平刘鎏何世达陶凤娟王伏春刘春生李晓珍任勇华
Owner HUBEI CENT SOUTH EXPLORATION & FOUND ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products