Construction Method of Prestressed High Retaining Wall with Anchor Cable of Pile Foundation
A construction method and high retaining wall technology, applied in infrastructure engineering, artificial islands, water conservancy projects, etc., can solve problems such as weak ability to resist geological disasters and insufficient anti-slip ability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The present invention will be further described below in conjunction with the accompanying drawings and embodiments. While the invention will be described in conjunction with the preferred embodiments, it will be understood that it is not intended to limit the invention to the described embodiments. On the contrary, the invention is to cover alternatives, modifications and equivalents, which may be included within the scope of the invention as defined by the appended claims.
[0025] refer to figure 1 As shown, open prestressed pipe piles 5 with a length of 18m, a pile diameter of 0.5m, and a wall thickness of 0.1m are laid in the foundation. The distance between the pipe piles is 4m, forming a pile group of 4 rows×25 columns. The height of the formed soil plug is between 12 and 14m, and the expansive concrete 9 containing 5‰ expansion agent is poured on the top of the soil plug of each pipe pile 5. When pouring, a long anchor cable with a diameter of 3 cm and a length...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com