Precontrol roof sublevel ore breaking once shaft forming method
A technology of pre-controlling top and section, applied in blasting and other directions, can solve the problems of free surface of blasting operation and insufficient compensation space, and achieve the effect of improving blasting efficiency, large compensation space and reducing construction cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] Embodiments of the present invention are further described below in conjunction with accompanying drawings:
[0017] The one-time well-forming method of pre-controlled top subdivision mine of the present invention mainly adopts the blasting scheme with parallel deep holes as the free surface. The parallel deep holes include empty holes and charge holes, and the charge holes include four cuts ①-④ hole, ⑤—⑧ four auxiliary holes and The four peripheral holes, ①-④ are charged in sections at intervals, Columnar continuous charge is adopted, and the arrangement and connection of each hole is as follows: figure 1 As shown, the details are as follows:
[0018] The hole diameter D is 300mm, the charge hole diameter d is 100mm, and the ore fragmentation coefficient K is 1.8. a is rounded to 300mm, The peripheral holes are also uniformly distributed on the periphery of the empty holes in sequence, the distance between two adjacent peripheral holes is 2000mm, ⑨, ⑩, Co...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com