Auto-starting control method for photovoltaic inverter
A photovoltaic inverter and inverter technology, applied in photovoltaic power generation, output power conversion devices, electrical components, etc., can solve the problems of reducing power generation efficiency, unable to automatically restart, etc., and achieve the effect of reducing unnecessary shutdowns
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0012] Example 1: After the photovoltaic inverter control system is powered on and initialized, the voltage, current and temperature parameters of the photovoltaic inverter are sampled and analyzed. , the photovoltaic inverter stops working and is disconnected from the switch of the public grid. When the photovoltaic inverter control system detects that the voltage, current and temperature parameters of the photovoltaic inverter are abnormal, it will trigger the photovoltaic inverter control system to monitor the timing of the downtime. When the downtime exceeds 3 minutes, the photovoltaic inverter control system will Determine whether the number of restarts exceeds 2 times (including 2 times), if not more than 2 times, send a signal to start the power tube of the inverter on the one hand, and send a signal to close the switch between the photovoltaic inverter and the public grid on the other hand, If it exceeds: 2 times, do not deal with it, keep the photovoltaic inverter in ...
Embodiment 2
[0013] Example 2: After the photovoltaic inverter control system is powered on and initialized, the voltage, current and temperature parameters of the photovoltaic inverter are sampled and analyzed. , the photovoltaic inverter stops working and is disconnected from the switch of the public grid. When the photovoltaic inverter control system detects that the voltage, current and temperature parameters of the photovoltaic inverter are abnormal, it will trigger the photovoltaic inverter control system to monitor the timing of the downtime. When it is found that the downtime exceeds 5 minutes, the photovoltaic inverter control system will Determine whether the number of restarts exceeds 4 times (including 4 times), if not more than 4 times, send a signal to start the power tube of the inverter on the one hand, and send a signal to close the switch between the photovoltaic inverter and the public grid on the other hand, If it exceeds: 4 times, do not process, keep the photovoltaic ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com