Design flow management system for electric power engineering
A technology of power engineering and process, applied in the field of power engineering design process management system, can solve the problems of low efficiency of information management, heavy workload, limited level of management personnel, etc., and achieve the effect of improving information management efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment ( 1
[0027] see figure 1 A schematic structural diagram of an embodiment of a power engineering design process management system of the present invention is shown.
[0028] Depend on figure 1 It can be seen that the power engineering design process management system includes:
[0029] Project category division module 1, the project category module 1 is used to divide the project categories according to the specific business of electric power engineering, such as: industry expansion projects, sporadic projects, etc.
[0030] A process customization module 2 connected to the project classification module 1, the process customization module 2 is used to customize the process of the electric project according to the category of the electric project. Different types of projects can customize different processes, that is, different operation steps. For example, the process includes: project construction card, project assignment, on-site measurement, engineering design, drawing verific...
Embodiment ( 2
[0035] see figure 2 A schematic structural diagram of another embodiment of a power engineering design process management system of the present invention is shown.
[0036] Depend on figure 2 It can be seen that the system includes: a project category classification module 1, and the project category module 1 is used to classify project categories according to different specific businesses of electric power engineering.
[0037] A process customization module 2 connected to the project classification module 1, the process customization module 2 is used to customize the process of the electric project according to the category of the electric project.
[0038] A user designation module 3 connected to the process customization module 2, the user designation module 3 is used to designate relevant execution departments or personnel according to the flow of the electric power project.
[0039] A data management module 4 connected to the user designation module 3, the data manag...
Embodiment ( 3
[0044] see image 3 A schematic structural diagram of another embodiment of a power engineering design process management system of the present invention is shown.
[0045] Depend on image 3 It can be seen that the system includes: a project category classification module 1, and the project category module 1 is used to classify project categories according to different specific businesses of electric power engineering.
[0046] A process customization module 2 connected to the project classification module 1, the process customization module 2 is used to customize the process of the electric project according to the category of the electric project.
[0047] A user designation module 3 connected to the process customization module 2, the user designation module 3 is used to designate relevant execution departments or personnel according to the flow of the electric power project.
[0048] A data management module 4 connected to the user designation module 3, the data managem...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com