Installation method of outfitting parts
An outfitting and installation stage technology, applied in the field of outfitting installation, can solve problems such as low work efficiency and long outfitting installation cycle, and achieve the effects of improving work efficiency, shortening the shipbuilding cycle, and shortening the installation cycle
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0009] The installation operation method of the outfitting of the present invention includes a ship interior part and a non-ship interior part, and the ship interior part includes a general group installation stage, an area installation stage, and a system installation stage; the general group installation stage refers to two or more subsections After the general assembly, proceed to the outfitting installation stage. At this stage, it is mainly to install some segmented and reversed closing pipes and outfitting parts between the two closing segments, such as hanging beams, inclined ladders, etc.; at the same time, if the lifting capacity If permitted, the subsection frontal equipment base and some small equipment can be divided into this stage for installation; the regional installation stage refers to the installation stage in the dock and the dock installation stage. This stage mainly installs some large equipment and the general section The closing pipes between them, the e...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com