Combined scheduling method of satellite-ground measurement and control resources of low-mid-orbit satellite constellation based on orbit determination constraint satisfaction
A technology of constraint satisfaction and joint scheduling, which is applied to integrated navigators, special data processing applications, instruments, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0099] The present invention will be further described in detail below with reference to specific examples.
[0100] The scenarios in this embodiment are as follows:
[0101] The space scene consists of 100 medium and low orbit satellites. Among them: 24 medium-orbit satellites form the Walker24 / 3 / 1 constellation, with an orbital height of 21,528km and an orbital inclination of 55°; each satellite can establish an inter-satellite link at the same time; 24 satellites in sun-synchronous orbit with an orbital height of 500km~2000km, the orbital inclination is about 98°; 52 low-orbit satellites, the orbital height is 500km~2000km, and the orbital inclination is 60°~100°.
[0102] The ground scene consists of 7 ground stations. Among them: 6 ground stations are installed with single-beam measurement and control equipment, and 1 ground station is installed with 4-beam measurement and control equipment. The seven ground stations are located in the northeast, northwest, central and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com