Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Grouting water sealing and reinforcement construction process capable of realizing draining and plugging combined effect for underground water in tunnel

A technology combining dredging and plugging and construction technology, applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as increasing construction difficulty, intensifying water layer diffusion and infiltration, and increasing local water pressure, so as to avoid surface subsidence, The effect of ensuring the water content in the soil layer

Inactive Publication Date: 2015-02-04
BEIJING MUNICIPAL CONSTR
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the tunnel construction under the condition of no precipitation, in the past, the simple grouting was used to block the ground. Since the grouting reinforcement stratum is easily affected by the groundwater pressure, the local water pressure increases, which directly aggravates the weakness of the water layer to the tunnel grouting. The trend of diffusion and infiltration at places has virtually increased the difficulty of construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] The present invention is a kind of grouting and water-stop reinforcement construction technology combined with underground water dredging and plugging in the tunnel, which comprises the following process steps:

[0014] (1) When the tunnel construction encounters loose groundwater rich in groundwater, first install grouting pipes in the tunnel to the outside, and at the same time, set up drain pipes to connect the drain pipes to vacuum pumps to achieve local water pumping. The grouting pipe is vertically inclined at 35°, and the drain pipe is vertically inclined at 22°. Both the grouting pipe and the drainage pipe are made of Φ32*3.5 drilled seamless steel pipes.

[0015] (2), dilute the water glass of the original slurry 39Be' to 28Be' with water, mix the TGRM grouting material and cement according to the ratio of 1:3, and mix the above two slurries 1:1 to make A liquid; mix the original slurry 39Be' Water glass is diluted with water to 30Be', concentrated phosphoric ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a grouting water sealing and reinforcement construction process capable of realizing a draining and plugging combined effect for underground water in a tunnel. The grouting water sealing and reinforcement construction process includes steps of (1), arranging grouting pipes from the inner side to the outer side of the tunnel, simultaneously arranging drain pipes matched with the grouting pipes in the tunnel, connecting the drain pipes with a vacuum pump so as to locally pump the water; (2), diluting sodium silicate of raw grout 39Be' to obtain grout 28Be', mixing TGRM grouting materials with cement according to a proportion of 1:3 to obtain second grout, mixing the grout 28Be' with the second grout according to a proportion of 1:1 to obtain liquid A, diluting sodium silicate of raw grout 39Be' by water to obtain grout 30Be', diluting strong phosphoric acid by water according to a proportion of 1:6 to obtain diluted phosphoric acid, and mixing the grout 30Be' with the diluted phosphoric acid according to a proportion of 1:1 to obtain liquid B; (3), alternately filling the liquid A and the liquid B into reinforcement soil layers outside an excavation range of the tunnel via the grouting pipes to complete grouting for the periphery of the tunnel; and (4), alternately filling the liquid A and the liquid B into a 1.5m range of the periphery of an excavation face via small pipes. The grouting water sealing and reinforcement construction process has the advantages that 'draining' and 'plugging' are combined and work along both lines in the construction process, accordingly, the underground water is prevented from diffusing and permeating to feeble grouted positions, the tunnel construction difficulty is reduced, and the construction safety degree is increased.

Description

【Technical field】 [0001] The invention relates to a building construction method, in particular to a construction technique of grouting, sealing and water-stopping in a tunnel combined with dredging and plugging of underground water. 【Background technique】 [0002] The key to the underground excavation construction of the tunnel is that the tunnel is under the groundwater and in the loose ground, and the tunnel lining construction can be carried out safely under the premise of ensuring the quality through grouting, water sealing and reinforcement. In the tunnel construction under the condition of no precipitation, in the past, the simple grouting was used to block the ground. Since the grouting reinforcement stratum is easily affected by the groundwater pressure, the local water pressure increases, which directly aggravates the weakness of the water layer to the tunnel grouting. The trend of diffusion and infiltration at places has virtually increased the difficulty of const...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/38
Inventor 韩化龙朱玉明王赢泽魏之奇王永华
Owner BEIJING MUNICIPAL CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products