Concrete grouting construction method and device for implementing same
A construction method and construction device technology, which is applied in the direction of foundation structure engineering, construction, sheet pile walls, etc., can solve the problems of pile body quality defects, no mud circulation treatment, etc., and achieve the effect of ensuring the quality of piles
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] refer to figure 1 , the present invention is a kind of concrete pouring construction method, is characterized in that, comprises the following steps:
[0018] 1) Pour a section of underwater concrete in the concrete pouring slot;
[0019] 2) Detecting the excess of the mud index on the rising surface of the underwater concrete;
[0020] 3) Use the slag extraction pipe to extract the slag at a distance of 1-2m from the underwater concrete surface, and at the same time replenish the grout, and then continue to pour the underwater concrete;
[0021] 4) Lift the slag extraction pipe so that the slag extraction pipe is always located at 1-2m above the gradually rising underwater concrete surface until the concrete is poured.
[0022] The concrete pouring construction device implementing the above method includes a plurality of concrete conduits 1 that extend into the underwater concrete at one end of the pouring slot, the top of each concrete conduit 1 is provided with a f...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com