Method for identifying safety risk in bridge construction period
A technology of safety risk and identification method, applied in the field of building construction, can solve the problems of large uncertainty of risk source identification results, not scientific and objective, and large influence of LEC score.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The technical solutions in the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention.
[0029] figure 1 Shown is a schematic flow chart of the safety risk identification method during the bridge construction period of the present invention, and the safety risk identification method during the bridge construction period includes the following steps:
[0030] Step 1: For each construction stage, create a matrix with n rows and m columns, where n represents the number of hazards, and m represents the number of indicators affecting hazards. In this embodiment, m=3, and the indicators affecting hazards are potential hazards nature, the existence conditions of bridge construction safety risks, and the triggering factors of risk accidents.
[0031] Step 2: According to the LEC scoring method in the project, set X ij is the original value of the j index of the i hazard source in the system. For...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com