Ecological corridor for removing nitrogen and phosphorus of micro-polluted river water and construction method thereof
A micro-pollution, corridor technology, applied in chemical instruments and methods, biological water/sewage treatment, water/sludge/sewage treatment, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] The ecological corridor purification project (large-scale) experiment was carried out in a slightly polluted river in a certain river in southern Jiangsu. The river is a river flowing into a lake, polluted by upstream domestic sewage and agricultural non-point source sewage, and the water body is in a state of eutrophication.
[0051] (1) Site selection for the construction of the ecological corridor: the pond along the Xiaxi River and near the entrance of the river Gehu Lake is selected as the project site. The shape of the pond is approximately rectangular, and the area is 100m×200m=20000m 2 .
[0052] (2) dredging the bottom of the pond, and doing compaction and simple anti-seepage treatment to form a simple leak-proof base 6, and the slope of the bottom of the pond is controlled within 0.1%;
[0053] (3) Build the water inlet 4 and the overflow outlet 5 of the ecological corridor system, the water depth of the system is 1.5m, and the water depth in the system is co...
Embodiment 2
[0059] Example 2: Micro-polluted river ecological corridor purification project (small).
[0060] (1) Project site selection: choose a place in southern Jiangsu for experimentation, and transform it from an existing fish pond. The area of the fish pond is 120m*40m=4800m 2 ;
[0061] (2) dredging the bottom of the pond, and doing compaction and simple anti-seepage treatment to form a simple leak-proof base 6, and the slope at the bottom of the pond is controlled at 0.1%;
[0062] (3) Build the ecological corridor system water inlet 4 (pumping station pumping water) and overflow outlet 5, the water depth of the system is 1.0m, and the water depth in the system is controlled by the overflow outlet method;
[0063] (4) Build diversion dams 2 and build diversion corridors: there are diversion dams 2 connected to the embankment 1 of the pond in the direction parallel to the length of the pond, and diversion dams 2 are built every 13m. The connected banks of the two dams are in ...
Embodiment 3
[0068] Example 3: Micro-polluted river ecological corridor purification project (medium-sized).
[0069] (1) Project site selection: select a certain place in southern Jiangsu for experimentation, and transform it from the existing Duantoubang. The area is 200m*40m=8000m 2 ;
[0070] (2) dredging the bottom of the ditch and bang, and doing compaction and simple anti-seepage treatment to form a simple leak-proof base 6, and the slope of the bottom of the ditch and bang is controlled at 0.1%;
[0071] (3) Build the ecological corridor system water inlet 4 (pumping station pumping water) and overflow outlet 5, the water depth of the system is 1.0m, and the water depth in the system is controlled by the overflow outlet method;
[0072] (4) Build diversion dams 2 and build diversion corridors: there are diversion dams 2 connected to the embankment 1 of the pond in the direction parallel to the length of the ditch, and diversion dams 2 are built every 20m. The connected banks of ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology