Open caisson deviation rectification construction method
A construction method and caisson technology, applied in the municipal field, can solve problems such as caisson jacking and rectification
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0013] The present embodiment will be described in detail below in conjunction with the accompanying drawings.
[0014] figure 1 It is a schematic diagram of caisson correction. In this embodiment, the caisson 2 needs to be lifted by 12 cm, and the foundation soil 3 below the caisson 2 is muddy soil with a water content of 60%. The quicklime pile 1 is arranged at the position where the caisson 2 needs to be jacked up, and the quicklime pile 1 is obliquely driven into the foundation soil 4, and the inclination rate of the quicklime pile 1 is 80°. Real-time monitoring should be carried out during the jacking process of caisson 2, and the construction should be temporarily stopped when the jacking amount of caisson 3 reaches 8cm. After 3 days, the quicklime pile 1 will be constructed after the soil is basically stable, so that caisson 2 will continue to be jacked up by 4cm.
[0015] Quicklime pile 1 is 8m long, the pile spacing is 0.9cm, and the pile diameter is 400cm. Quickli...
PUM
Property | Measurement | Unit |
---|---|---|
Pile length | aaaaa | aaaaa |
Spacing | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com