Zero spacing construction method for overlapping part of upper main tunnel and lower main tunnel of underground overpass
A construction method and technology for main tunnels, applied in tunnels, tunnel linings, underground chambers, etc., to reduce surface subsidence and avoid impacts
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] refer to Figure 1 to Figure 2 Examples of the present invention will be described.
[0020] The invention provides a zero-spacing construction method at the intersection and overlap of the upper and lower main tunnels of an underground overpass.
[0021] Embodiments of the present invention are described below.
[0022] 1. Construction of the upper tunnel with 4 construction methods: the small conduit 1 for advance grouting in the upper tunnel is used for advance grouting and support, and then press figure 2 In the order of ①, ②, ③, and ④, the soil is excavated in sections, and the upper tunnel initial support 2 and the upper tunnel CRD construction method temporary steel support 15 are applied. It is used as the initial support of the upper layer tunnel to strengthen the reinforced concrete beam 6 and the longitudinal I-beam of the arch foot of the upper layer tunnel and the anchor rod 16 of the locking foot.
[0023] 2. Construction of the upper tunnel secondary ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com