Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Zero spacing construction method for overlapping part of upper main tunnel and lower main tunnel of underground overpass

A construction method and technology for main tunnels, applied in tunnels, tunnel linings, underground chambers, etc., to reduce surface subsidence and avoid impacts

Inactive Publication Date: 2010-07-14
BEIJING JIAOTONG UNIV
View PDF0 Cites 27 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, with the large-scale construction of the underground road network, there will inevitably be spatial intersections between underground roads (that is, tunnels)

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Zero spacing construction method for overlapping part of upper main tunnel and lower main tunnel of underground overpass
  • Zero spacing construction method for overlapping part of upper main tunnel and lower main tunnel of underground overpass
  • Zero spacing construction method for overlapping part of upper main tunnel and lower main tunnel of underground overpass

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] refer to Figure 1 to Figure 2 Examples of the present invention will be described.

[0020] The invention provides a zero-spacing construction method at the intersection and overlap of the upper and lower main tunnels of an underground overpass.

[0021] Embodiments of the present invention are described below.

[0022] 1. Construction of the upper tunnel with 4 construction methods: the small conduit 1 for advance grouting in the upper tunnel is used for advance grouting and support, and then press figure 2 In the order of ①, ②, ③, and ④, the soil is excavated in sections, and the upper tunnel initial support 2 and the upper tunnel CRD construction method temporary steel support 15 are applied. It is used as the initial support of the upper layer tunnel to strengthen the reinforced concrete beam 6 and the longitudinal I-beam of the arch foot of the upper layer tunnel and the anchor rod 16 of the locking foot.

[0023] 2. Construction of the upper tunnel secondary ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a zero spacing construction technical method for an intersecting and overlapping part of an upper main tunnel and a lower main tunnel of an underground overpass, which belongs to construction technologies of tunnel engineering. The method comprises four procedure steps of: (1) excavating and supporting an upper-layer tunnel CRD (cross diaphragm) and strengthening the construction of reinforced concrete edge beams; (2) excavating and supporting a base pit of a lower-layer tunnel; (3) carrying out secondary lining construction outside the lower-layer tunnel; and (4) refilling the upper part of the secondary lining outside the lower-layer tunnel. The invention realizes the technical method which does not retain soil mass at the intersecting and overlapping part of the upper-layer main tunnel and the lower-layer main tunnel of the underground overpass and finishes the construction of the excavation and the support structure of the upper main tunnel and the lower main tunnel of an intersecting section in one step and solves the problems of structure influence to early built tunnel by the late built tunnel and the secondary disturbance to the ambient soil mass which are caused by the upper penetration or lower penetration due to the early and late construction of the upper main tunnel and the lower main tunnel.

Description

technical field [0001] The invention belongs to the tunnel engineering construction technology, in particular to a construction technology method with zero spacing at the intersection and overlap of the upper and lower main tunnels of an underground overpass. Background technique [0002] With the rapid increase of the number of urban vehicles, the limited road resources on the urban ground cannot meet the needs more and more, so serious traffic congestion occurs. This phenomenon has been experienced in major cities around the world. While people are paying close attention to the construction of urban subways and vigorously advocating public transportation, some major cities in the world have also begun to pay attention to the construction of underground roads and put them into practice. After the highway was dismantled, it was moved underground to form an underground two-way 10-car expressway; the central circular Shinjuku Line in Tokyo, Japan, with a length of 11 kilomete...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D9/08E21D11/04E21F15/00
Inventor 刘保国李勇逄铁铮乔春生李少刚
Owner BEIJING JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products