Excavation construction method of ultra-shallow buried uneven weathered stratum of tunnel
A construction method and tunnel technology, applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as poor geology, uneven weathering, and shallow tunnel burial.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] see figure 1 and figure 2 As shown, the excavation construction method of the present invention in the shallow buried uneven weathered stratum adopts the excavation construction method of the ultra-shallow buried uneven weathered stratum by entering the tunnel from the arch part. It adopts the sub-step method for construction. It is divided into four parts: the left side of the upper stage 1, the right side of the upper stage 2, the middle stage 3, and the lower stage 4; the specific construction steps are as follows:
[0020] 1), advance support of arch 5 (φ108 pipe shed advance pre-reinforcement):
[0021] In the 140° range of the tunnel arch, dense advanced 108 long tube sheds are adopted, with a length of 20-40m and a circumferential spacing of 40cm. The long tube sheds overlap 4-5m between cycles. The excavation is supplemented by a 1.5m ring of 3.5m-long encrypted φ42 advanced small conduit. The long tube shed is laid horizontally in advance, the guide wall is...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com