Examples
Embodiment 1
[0011] Example 1: 780g of base asphalt, 215g of waste rubber powder, 4.2g of extension agent and 0.8g of stabilizer.
[0012] Preparation method: (1) prepare extension agent, mix rubber softening oil with diallyl phthalate, and then stir at 120°C for 1.5 hours; (2) prepare stabilizer, Mix butyl thiuram with antioxidant 1076, then stir at 65°C for 1 hour; (3) prepare rubber powder modified asphalt, heat 780g of base asphalt to 180°C, then add 215g of waste rubber powder and 4.2 g the extension agent prepared in step (1) and mixed for 1.5 hours, then ground by colloid mill, after stirring for 2 hours, add 0.8g of the stabilizer prepared in step (2), and continue stirring for 2 hours to obtain modified rubber powder asphalt.
Embodiment 2
[0013] Example 2: 850g of base asphalt, 143g of waste rubber powder, 6g of extension agent and 1g of stabilizer.
[0014] Preparation method: (1) prepare extension agent, mix rubber softening oil with diallyl phthalate, and then stir at 130°C for 1 hour; (2) prepare stabilizer, Mix butyl thiuram with antioxidant 1076, then stir at 70°C for 0.8 hours; (3) prepare rubber powder modified asphalt, heat 850g base asphalt to 190°C, then add 143g waste rubber powder and 6g Mix the extension agent prepared in step (1) for 1 hour, then shear and stir, add 1 g of the stabilizer prepared in step (2) after stirring for 1.5 hours, and continue stirring for 2.5 hours to obtain rubber powder modified asphalt.
Embodiment 3
[0015] Example 3: 900g of base asphalt, 91g of waste rubber powder, 7.8g of extension agent and 1.2g of stabilizer.
[0016] Preparation method: (1) Prepare the extension agent, mix rubber softening oil with diallyl phthalate, and then stir at 140°C for 0.5 hours; (2) Prepare the stabilizer, mix the accelerator Mix butyl thiuram with antioxidant 1076, then stir at 75°C for 0.5 hours; (3) prepare rubber powder modified asphalt, heat 900g of base asphalt to 200°C, then add 91g of waste rubber powder and 7.8 g the extension agent prepared in step (1) and mixed for 0.5 hours, then ground by a colloid mill, and after stirring for 1 hour, add 1.2 g of the stabilizer prepared in step (2), and continue stirring for 3 hours to obtain modified rubber powder asphalt.
PUM
Property | Measurement | Unit |
---|---|---|
softening point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com