[0024] The plane of the nuclear island ring corridor in this embodiment is as follows figure 1 As shown, the ring corridor is located between the inner ring N of the island center with a radius of 15.3m and an elevation of minus 10.23m and the outer ring W of an elevation of minus 10.15m, with a width of 5.5m and an elevation of minus 13.38m. The steps of pre-splitting blasting are:
[0025] The first step is to dig down to negative 9.23m rock foundation at the selected location according to the elevation of the island center, and reserve a 1m reserve layer. Practice shows that the flatness of the upper part of the pre-splitting surface is poor. In order to ensure the integrity of the upper profile of the ring corridor of the nuclear island, a reserve layer of about 1m should be reserved during the pre-splitting blasting of the ring corridor. Step 2. Along the inner and outer circumferences of the ring corridor (that is, the inner and outer rings) at equal intervals S of 0.6m...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com