Function freezing/defreezing method in automatic switch optical network
An automatic switching, optical network technology, applied in the direction of data switching network, digital transmission system, electrical components, etc., can solve problems such as no better solution, achieve easy freezing preparation processing and automatic testing, strong practical operability, and ease of impact effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0052] This embodiment is a method for freezing functions in an automatic switching optical network, which includes the following steps:
[0053] 201. The control node receives a freeze command ASON_FREEZE_NODE of the management plane: 3, 1, 11, 60 (for a version that supports freezing modules and freezing delay). In this command, parameter 3 indicates that the ASON node identifier of the current ASON control node is 3, parameter 1 indicates that the freezing type is frozen, parameter 11 indicates that the TAP module is frozen, and parameter 60 indicates that the freezing delay is 60 seconds. After that, the parameter validity check is performed, and a successful response is returned to the management plane after the check is successful.
[0054] 202. The control node judges whether the freezing module parameter is included in the freezing command.
[0055] If there is a frozen module parameter, judge whether it is Normal;
[0056] If it is not Normal, read the module dependency tabl...
Embodiment 2
[0071] Similar to Embodiment 1, this embodiment assumes that the freeze command received from the management plane is: ASON_FREEZE_NODE: 3, 2, 0, 0 (where parameter 3 indicates that the ASON node identifier of the current ASON control node is 3; parameter 2 indicates the freezing type It is thawing; parameter 0 means that the freezing module is Normal, and the entire control node is thawed; the last parameter 0 means that the freezing delay is 0 seconds, and it is thawed immediately). After successful parameter verification, a successful response is returned to the management plane.
[0072] Since it is required to unfreeze the entire control node immediately, there is no need to read the module dependency table or start the delay timer. Send a thaw preparation notification message to each module immediately, and the delay parameter is 0.
[0073] After each module receives the unfreeze notification message, it resumes its normal processing, and will freeze the backlog of notifica...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com