Microgrid real-time optimization scheduling method based on day-ahead economic optimal operation plan

A technology with optimal operation plan and economy, applied in the direction of calculation, data processing application, forecasting, etc., it can solve the problem that the scheduling strategy cannot maintain the economy of the day-ahead operation plan, and achieve the effect of maintaining the economy.

Pending Publication Date: 2022-07-22
WENZHOU ELECTRIC POWER BUREAU +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a microgrid real-time optimal scheduling method based on the optimal operation plan of the day-ahead economy, which can effectively solve the problem that the existing scheduling strategy cannot effectively maintain the economy of the day-ahead operation plan during real-time operation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Microgrid real-time optimization scheduling method based on day-ahead economic optimal operation plan
  • Microgrid real-time optimization scheduling method based on day-ahead economic optimal operation plan
  • Microgrid real-time optimization scheduling method based on day-ahead economic optimal operation plan

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0067] The following describes in detail the embodiments of the present invention, examples of which are illustrated in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary, and are intended to explain the present invention and should not be construed as limiting the present invention.

[0068] The microgrid real-time optimal scheduling method based on the economic optimal operation plan ahead of time includes the following steps in sequence:

[0069] S1. Establish a power generation unit model, including the power generation models of gas turbines, wind turbines and photovoltaic power generation units;

[0070] S2. Formulate the economic optimal operation plan ahead of time, and construct including load balance constraints and equipment operation constraints;

[0071] S3. Real-time optimal scheduling of microgrids based on the economic optimal operation plan a day ago, and real-time corrections and rolling adjus...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a micro-grid real-time optimization scheduling method based on a day-ahead economic optimal operation plan, and the method sequentially comprises the following steps: S1, building power generation unit models which comprise power generation models of a gas turbine, a wind driven generator and a photovoltaic power generation unit; s2, making a day-ahead economic optimal operation plan, and constructing an optimization model comprising load balance constraints and equipment operation constraints; and S3, performing real-time correction and rolling scheduling based on the real-time optimization scheduling of the micro-grid of the day-ahead economic optimal operation plan to ensure that the generating capacity and the load are kept balanced during operation and improve the operation economy of the system. The micro-grid real-time optimization scheduling method based on the day-ahead economic optimal operation plan has the advantages that the economy of the day-ahead operation plan can be kept to the maximum extent under the condition of meeting power balance through a two-stage real-time correction and rolling scheduling technology on the basis of the day-ahead economic optimal operation plan.

Description

technical field [0001] The invention relates to the technical field of microgrid economic dispatch, in particular to a microgrid real-time optimal dispatch method based on a day-ahead economic optimal operation plan. Background technique [0002] With the rapid development of the energy industry and the diversified development of energy utilization forms, various forms of clean energy power generation technologies such as wind, light, gas, and biomass energy have been more and more effectively applied. One of the typical utilization methods is the distributed power generation technology represented by wind power generation, photovoltaic cells, micro gas turbines and storage batteries. The access of distributed power sources breaks the top-down power supply mode of the traditional power grid. Distributed power sources can supply energy to the loads in the surrounding area, and can also sell electricity to the power grid, thus forming a micro-grid that can interact with the la...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06
CPCG06Q10/04G06Q10/06313G06Q10/06393G06Q50/06
Inventor 孙景钌刘辉乐奚洪磊胡长洪俞凯孔凡坊刘磊倪秋龙叶琳杨滢项烨鋆赵碚刘津源陈梦翔施正钗刘曦卢剑辉
Owner WENZHOU ELECTRIC POWER BUREAU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products