[0081] Example 1: If the resource occupancy rate of carrier 1 is 50%, the remaining available resources are 20 subchannels, the resource occupancy rate of carrier 2 is 40%, and the remaining available resources are 10 subchannels, the configured resource occupancy weight is 0.6, and the remaining Available resources have a weight of 0.4;
[0082] The selected factor of carrier 1 is: P1=0.6*(1-0.5)*100+0.4*20=38;
[0083] The selection factor of carrier 2 is: P2=0.6*(1-0.4)*100+0.4*10=40;
[0084] The terminal selects carrier 2 as the sending carrier.
example 2
[0085] Example 2: The resource occupancy rate of carrier 1 is 50%, the remaining available resources are 20 subchannels, the resource occupancy rate of carrier 2 is 40%, the remaining available resources are 10 subchannels, the configured resource occupancy weight is 0.4, and the remaining available resources The resource has a weight of 0.6;
[0086] The selected factor of carrier 1 is: P1=0.4*(1-0.5)*100+0.6*20=32;
[0087] The selection factor of carrier 2 is: P2=0.4*(1-0.4)*100+0.6*10=30;
[0088] The terminal selects carrier 1 as the sending carrier.
example 3
[0089] Example 3: There are 4 candidate carriers corresponding to the service priority sent by the terminal, and the terminal needs to select 2 of them as the sending carrier. The resource occupancy rate of carrier 1 is 50%, and the remaining available resources are 20 subchannels; the resource occupancy rate of carrier 2 is 40%, and the remaining available resources are 10 subchannels; the resource occupancy rate of carrier 3 is 30%, and the remaining available The resources are 25 sub-channels, the resource occupancy rate of carrier 4 is 40%, the remaining available resources are 20 sub-channels, the weight of the configured resource occupancy rate is 0.4, and the weight of the remaining available resources is 0.8;
[0090] The selected factor of carrier 1 is: P1=0.4*(1-0.5)*100+0.8*20=36;
[0091] The selected factor of carrier 2 is: P2=0.4*(1-0.4)*100+0.8*10=32;
[0092] The selected factor of carrier 3 is: P3=0.4*(1-0.3)*100+0.8*25=48;
[0093] The selected factor of ca...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com