Peak regulation auxiliary service compensation method and device considering green certificate
A technology of ancillary services and green certificates, which is applied in the field of compensation for peak shaving auxiliary services considering green certificates, can solve problems such as the imbalance in the compensation mechanism of the peak shaving ancillary service market, and achieve a fair compensation mechanism
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0050] Such as figure 1 As shown, a compensation method for peak shaving auxiliary services considering green certificates provided by an embodiment of the present invention includes at least the following steps:
[0051] S101. Divide the time of the day according to the preset time threshold, obtain the corresponding time period set, and use the difference between the predicted power generation curve and the actual power generation curve of the renewable energy unit in each time period in the time period set The deviation power generation of the renewable energy unit in each time period is obtained, and the deviation power generation coefficient between the predicted power generation curve and the actual power generation curve of the renewable energy unit; wherein, the preset time threshold is set according to the actual situation;
[0052] For step S101, it needs to be added that the division of time can be made according to the actual situation. In this scheme, 24 hours a d...
no. 2 example
[0099] Such as image 3 As mentioned above, the peak shaving auxiliary service compensation device 200 considering the green certificate provided by the embodiment of the present invention includes: a deviation power generation coefficient acquisition unit 201, a deviation green certificate amount calculation unit 202, a deviation green certificate amount calculation unit 203, and Compensation unit 204; wherein,
[0100] The deviation power generation coefficient acquisition unit 201 is used to divide the time of the day according to the preset time threshold, obtain the corresponding time period set, and use the renewable energy in each time period in the time period set The deviation power generation between the predicted power generation curve and the actual power generation curve of the unit, and obtain the deviation power generation coefficient between the predicted power generation curve and the actual power generation curve of the renewable energy unit in each time peri...
no. 3 example
[0109] A computer terminal device provided by an embodiment of the present invention includes one or more processors; a memory, coupled to the processor, for storing one or more programs; when the one or more programs are executed by the Executed by one or more processors, so that the one or more processors implement the peak shaving auxiliary service compensation method considering the green certificate as described in any one of the above.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com