Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Concrete-filled steel tube anti-seismic bridge pile foundation and pile foundation construction method thereof

A technology of concrete filled steel tube and construction method, which is applied in basic structure engineering, sheet pile walls, buildings, etc., can solve the problems of small bonding area of ​​the bottom surface, affecting the structural strength, insufficient stability, etc., avoiding interference effects, facilitating construction operations, Avoid loosening effects

Active Publication Date: 2021-01-26
浙江中正岩土技术有限公司
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, most of the existing bridge pile foundation structures are poured directly inside the foundation pit, so the bonding area with the bottom surface is small, the stability is insufficient, and it cannot be reinforced from the side, which affects the structural strength, and is not conducive to use. Operation and post-maintenance are troublesome, and a new structure and method need to be proposed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Concrete-filled steel tube anti-seismic bridge pile foundation and pile foundation construction method thereof
  • Concrete-filled steel tube anti-seismic bridge pile foundation and pile foundation construction method thereof
  • Concrete-filled steel tube anti-seismic bridge pile foundation and pile foundation construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. The embodiments of the present invention, and all other embodiments obtained by those of ordinary skill in the art without creative work, fall within the protection scope of the present invention.

[0037] see Figure 1-3 , a concrete-filled steel tube seismic bridge pile foundation and a pile foundation construction method, including a fixed base 1, please refer to figure 1 and figure 2 One side surface of the fixed base 1 is provided with a construction groove 11, the bottom surface of the construction groove 11 is fixedly connected with a supporting plastic cylinder 12, and the other side surface of the supporting plastic cylinder 12 is fixe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a concrete-filled steel tube anti-seismic bridge pile foundation and a pile foundation construction method thereof. The concrete-filled steel tube anti-seismic bridge pile foundation comprises a fixed base, a construction groove is formed in the surface of one side of the fixed base, a supporting plastic barrel is fixedly connected to the bottom surface of the constructiongroove, and a concrete cylinder is fixedly poured on the surface of the other side of the supporting plastic barrel. A positioning groove is formed in the surface of the other end of the concrete cylinder, a steel tube is fixedly inserted into the side face of the concrete cylinder, one end of the steel tube is inserted into the bottom of the construction groove, a positioning block is fixedly welded to the side face of the steel tube, and the side face of the positioning block is inserted into the side face of the positioning groove. Communication notches are formed in the two sides of one end of the steel tube correspondingly, a concrete pile body is fixedly poured on the side face of the steel tube, and one end of the concrete pile body is connected to the bottom face of the construction groove in a pouring mode. Therefore, the efficient and convenient performance of construction can be greatly improved, and the structural strength and the use safety of the pile foundation are guaranteed.

Description

technical field [0001] The invention relates to the field of bridge pile foundations, in particular to a concrete-filled steel tube seismic bridge pile foundation and a pile foundation construction method. Background technique [0002] In the process of bridge construction, in order to facilitate subsequent laying and construction safety, the pile foundation is generally poured first to form a stable supporting structure. [0003] However, the existing bridge pile foundation structures are mostly poured directly inside the foundation pit, so the joint area with the bottom surface is small, the stability is insufficient, and it cannot be reinforced from the side, which affects the structural strength, and is not conducive to use. It is troublesome to operate and maintain later, and a new structure and method need to be proposed. SUMMARY OF THE INVENTION [0004] In view of the problems existing in the prior art, the purpose of the present invention is to provide a concrete...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D27/42E02D27/34E02D5/54
CPCE02D27/42E02D27/34E02D5/54
Inventor 周旭东陈美娟李泽良周嵩
Owner 浙江中正岩土技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products