Pipe network topological relation checking and repairing method
A technology of topology relationship and pipe network, applied in the field of drainage pipe network, can solve the problems of high time cost, low efficiency, and huge workload of pipe network inspection.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0076] A method for checking and repairing the topological relationship of a pipe network, comprising the following steps:
[0077] S1. Select a pipe network path with known flow direction in the pipe network to be inspected, mark n nodes according to the order of flow direction, measure the initial invert elevation values of all nodes in the pipe network, and ensure the starting position of the node The initial invert elevation value is accurate;
[0078] S2. The pipelines between adjacent nodes form a pipe section, traverse all pipe sections in sequence along the flow direction of the pipe network path, calculate the slope of each pipe section, and obtain the slope data of the pipe section;
[0079] The slope data of the pipe section in S2 is obtained using the following model:
[0080]
[0081] Wherein, i is the i-th node of the pipe network path, a total of n nodes, i=1 is the node of the starting position of the pipe network path from upstream, L i,i+1 Indicates th...
Embodiment 2
[0137] This embodiment discloses a method for checking and repairing the topological relationship of the drainage pipe network by adopting the method for checking and repairing the topological relationship of the pipe network in the above embodiment.
[0138] Such as image 3 As shown, it is the topological structure of the drainage pipe network, where the labels prefixed with "MH" indicate inspection well nodes, the labels prefixed with "O" indicate outlet nodes, and the labels prefixed with "CO" indicate pipe sections. According to the location of the water outlet of the pipe network, the elevation of the urban terrain and the characteristics of the water system, the water flow direction of the pipe network can be determined, as shown by the arrow in the figure. Table 1 shows the relevant parameters of inspection wells and water outlet nodes, and Table 2 shows the parameters of each pipe section. It is known that the invert elevations of the upstream start nodes MH-1, MH-13...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com