Method for treating large-particle-size block stones in hydraulic full-pile-casing rotary excavating pile construction
A treatment method and technology of full casing, which is applied in sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of difficult stone removal, thick stone layer, and the casing cannot be pressed down smoothly, so as to save cost, time saving effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0020] The present invention proposes a method for processing large-sized rocks in the construction of hydraulic full-casing rotary excavation piles, which includes the following steps:
[0021] (1) When the distribution of the block rock layer is shallow and the block rock layer is not thick, use an excavator to directly remove the block stone layer in a small area, and then backfill the earthwork for pile foundation construction.
[0022] (2) When the burial depth or thickness of the block rock layer is 1m, proceed as follows:
[0023] S1. When the boulder is located at the center of the pile position, the casing is first pressed down to the elevation of the boulder layer. According to the particle size and position of the boulder, under the protection of the casing, workers are arranged to remove it manually.
[0024] S2. When the block is only partly located in the pile position, use the casing hydraulic device to squeeze the block first. When the block is located in the s...
Embodiment 2
[0029] The present invention proposes a method for processing large-sized rocks in the construction of hydraulic full-casing rotary excavation piles, which includes the following steps:
[0030] (1) When the block stone layer is shallow and not thick, use an excavator to remove the block stone layer directly in a small area, and then backfill the earthwork for pile foundation construction.
[0031] (2) When the burial depth or thickness of the block rock layer is 1.5m, proceed according to the following steps:
[0032] S1. When the boulder is located at the center of the pile position, the casing is first pressed down to the elevation of the boulder layer. According to the particle size and position of the boulder, under the protection of the casing, workers are arranged to remove it manually.
[0033] S2. When the block is only partly located in the pile position, use the casing hydraulic device to squeeze the block first. When the block is located in the silt layer, the bloc...
Embodiment 3
[0038] The present invention proposes a method for processing large-sized rocks in the construction of hydraulic full-casing rotary excavation piles, which includes the following steps:
[0039] (1) When the block stone layer is shallow and not thick, use an excavator to remove the block stone layer directly in a small area, and then backfill the earthwork for pile foundation construction.
[0040] (2) When the burial depth or thickness of the block rock layer is 2m, proceed as follows:
[0041] S1. When the boulder is located at the center of the pile position, the casing is first pressed down to the elevation of the boulder layer. According to the particle size and position of the boulder, under the protection of the casing, workers are arranged to remove it manually.
[0042] S2. When the block is only partly located in the pile position, use the casing hydraulic device to squeeze the block first. When the block is located in the silt layer, the block can be squeezed out of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com