Constructional engineering dynamic monitoring system and application method
A technology of dynamic monitoring and construction engineering, which is applied in the direction of measuring devices, optical devices, instruments, etc., can solve the problems of wrong measurement results, position deviation of measuring devices, etc., and achieve the effect of reducing monitoring costs, saving manpower and auxiliary equipment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0066] Such as figure 1 As shown, the present embodiment provides a dynamic monitoring system for construction engineering, including a data acquisition module, a data processing module and a control module, and the data processing module is connected to the data acquisition module and the control module respectively, wherein: the data acquisition module includes an image acquisition unit and a displacement information collection unit, the image collection unit is used to collect target building image information and sent to the data processing module; the displacement information collection unit is used to collect the position information of the data collection module and sent to the data processing module; the data collection module is at least Two and distributed in different positions around the target building, at least two parts of the target building collected by the data acquisition modules are in the same position; the data processing module is used to receive the imag...
Embodiment 2
[0073] Such as figure 2 As shown, the using method of the construction engineering dynamic monitoring system in embodiment 1 comprises the following steps:
[0074] S1. The data acquisition module collects the initial position information of the data acquisition module and the initial image information of the target building, and the data processing module analyzes and records the initial position information of the image acquisition unit and the target building monitoring point; specifically:
[0075] S11. The displacement information collection unit collects the initial position information of the data collection module and sends it to the data processing module, and the image collection unit collects the initial image information of the target building and sends it to the data processing module; S12. The data processing module according to the data collection module. For initial position information, select any image acquisition unit as the origin of the base coordinate sy...
Embodiment 3
[0086]The difference between this embodiment and Embodiment 2 is: in this embodiment, the data acquisition module also includes a laser, and the control module also includes a second control unit, and the laser is connected to the displacement information acquisition unit and the second control unit respectively; S1 also includes steps S14 The second control unit receives the control signal sent by the data processing module to control the laser to emit laser light to the monitoring point, and the displacement information acquisition unit collects the position information of the laser and the laser emission angle information and sends them to the data processing module; S27 The specific process of determining the displacement is as follows: , the second control unit receives the control signal sent by the data processing module to control the laser to emit laser light to the surface of the target building along the laser emission angle in S14, and the image acquisition unit coll...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com