Manual hole digging pile concrete precast retaining wall and construction method thereof

A technology of manual excavation of piles and concrete, which is applied in the direction of sheet pile walls, foundation structure engineering, construction, etc., and can solve problems such as failure to fundamentally prevent soil wall collapse, long construction period, and difficulty in ensuring the quality of concrete

Active Publication Date: 2019-09-20
XIANGTAN UNIV
View PDF6 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, cast-in-place concrete retaining walls are commonly used, but due to the limited construction site, the quality of the concrete is not easy to guarantee and the construction period is long
When the geological conditions are complex and the earth pressure is high, the strength of the retaining wall may not meet the requirements, and there are great safety hazards
And the existing retaining wall only prevents accidents after the earth wall collapses, and does not fundamentally prevent the earth wall from collapsing, nor does it provide corresponding early warning measures

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Manual hole digging pile concrete precast retaining wall and construction method thereof
  • Manual hole digging pile concrete precast retaining wall and construction method thereof
  • Manual hole digging pile concrete precast retaining wall and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0173] A concrete prefabricated retaining wall of manual digging piles, the prefabricated retaining wall comprises: a retaining wall main body 1 and an elastic structure layer 2 . The retaining wall main body 1 is connected end to end to form a complete concrete retaining wall. The elastic structure layer 2 is arranged on the outer side of the wall main body 1 .

Embodiment 2

[0175] Example 1 is repeated, except that the elastic structural layer 2 includes: a capsule block 201 , and a medium inlet and outlet 202 . The inside of the capsule block 201 communicates with the outside through the medium inlet and outlet 202 . The capsule block 201 is disposed on the outside of the wall main body 1 .

Embodiment 3

[0177] Embodiment 2 is repeated, except that the elastic structural layer 2 further includes: a balancing duct 203 . The capsule blocks 201 between adjacent retaining walls are communicated through a balancing pipe 203 . The prefabricated retaining wall also includes: a water-stop pad 101 . The water-stop pad 101 is arranged on the upper end surface of the main wall main body 1 , and / or the water-stop pad 101 is arranged on the lower end surface of the main wall main body 1 .

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a manual hole digging pile concrete precast retaining wall and a construction method thereof. The manual hole digging pile concrete precast retaining wall comprises retaining wall bodies and elastic structural layers; and the retaining wall bodies are connected end to end to form the complete concrete retaining wall, and the elastic structural layers are arranged on the outer sides of the retaining wall bodies. According to the manual hole digging pile concrete precast retaining wall, by arranging the elastic structural layers on the outer sides of the retaining wall bodies, the effects of compacting soil, preventing soil collapse and delaying the collapse time are realized, and the personal safety of constructors is better guaranteed.

Description

technical field [0001] The invention relates to a concrete prefabricated retaining wall of an artificial digging pile, in particular to a concrete prefabricated retaining wall of an artificial digging pile, which belongs to the construction field. Background technique [0002] As a traditional pile foundation treatment method, artificial excavated piles have many advantages such as no disturbance to residents, low cost, simple equipment, clear soil layers, clean sediment, and the ability to directly judge the geological conditions of the bearing strata. However, there are restrictive conditions such as high labor intensity, high soil quality and safety protection requirements. The retaining wall of the pile hole is a key component to ensure the safe hole formation of the manual digging pile. At present, cast-in-place concrete retaining walls are commonly used, but due to the limited construction site, the quality of the concrete is not easy to guarantee and the construction...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D5/68E02D5/34
CPCE02D5/34E02D5/68
Inventor 陈宾曾浩哲张涛龚成唐文辉康宁屈子怡
Owner XIANGTAN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products