Semi-prefabricated UHPC shell overlap cover beam and prefabricated pier stud connecting structure and construction method thereof
A semi-prefabricated and prefabricated pier technology, applied in bridges, bridge parts, bridge construction, etc., can solve problems affecting durability, discontinuity, and high support costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] In order to make the above-mentioned features and advantages of the present invention more comprehensible, the following specific embodiments are described in detail with reference to the accompanying drawings.
[0026] like Figure 1~4 As shown, a semi-prefabricated UHPC shell superimposed cover beam and prefabricated pier column connection structure, including a semi-prefabricated UHPC cover beam shell 1 and a prefabricated pier column 2 located under the semi-prefabricated UHPC cover beam shell, the semi-prefabricated UHPC cover The beam shell is a shell-shaped structure with an inner hollow and no cover. The top of the prefabricated pier column is vertically provided with a pier column rear sprue 3, and the bottom of the semi-prefabricated UHPC cover beam shell is provided with a pier column. The coaxial and matching through-hole 4 of the rear pouring groove is located at the center of the bottom of the semi-prefabricated UHPC cover beam shell, and several pier colu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com