Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Project transaction closed-loop analysis method

An analysis method and project technology, applied in the field of closed-loop analysis of project changes, can solve problems such as non-compliance in execution, increased operational risks, and project schedule delays

Pending Publication Date: 2019-07-19
STATE GRID FUJIAN ELECTRIC POWER CO LTD +3
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] During the operation of the project, there are usually problems of project schedule delay and non-compliance, resulting in increased operational risk

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project transaction closed-loop analysis method
  • Project transaction closed-loop analysis method
  • Project transaction closed-loop analysis method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0006] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail with reference to the accompanying drawings. This description presents, by way of illustration and not limitation, specific embodiments consistent with the principles of the invention in sufficient detail to enable those skilled in the art to practice the invention without departing from this disclosure. Other embodiments may be utilized and the structure of elements may be changed and / or substituted within the scope and spirit of the invention. Accordingly, the following detailed description should not be read in a limiting sense.

[0007] The present invention provides a method for closed-loop analysis of project abnormalities, including:

[0008] Step S100 , based on the project milestone time, monitor the compliance status of the project from two dimensions of unit and time, and obtain thematic monitoring results...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a project transaction closed-loop analysis method, which comprises the following steps of S100, monitoring the compliance condition of a project from two dimensions of a unitand time based on the project milestone time, and obtaining a special monitoring result; step S200, according to a special monitoring result, positioning a position where the abnormal action occurs, the monitoring result comprising a monitoring white list, a monitoring black list and a monitoring gray list; step S300, importing the monitoring result into an analysis tool, wherein the analysis toolautomatically removes a white list of the special monitoring result; and step S400, using a data visualization tool to visually configure and display the thematic monitoring result without the whitelist based on the user-defined rectification index and the newly-added index value.

Description

technical field [0001] The invention relates to a method for project abnormality closed-loop analysis. Background technique [0002] During the operation of the project, there are usually problems of project schedule delay and non-compliance, which lead to increased operational risks. According to the requirements of "State Grid Fujian Provincial Electric Power Company's Opinions on Closed-loop Management of Comprehensive Plan Fund Projects (Trial)", there is an urgent need for an analysis method that can effectively monitor project conditions, timely discover project progress and non-compliance issues, and control Project Execution Risk. Contents of the invention [0003] In order to solve the above technical problems, the present invention proposes a project abnormality closed-loop analysis method, including: step S100, based on the project milestone time, monitor the compliance of the project from two dimensions of unit and time, and obtain thematic monitoring results;...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10
CPCG06Q10/103
Inventor 王周李晖钟云南池文磊陈行滨占彤平李霄铭李尚洪谢春许梓明温天宝程友平陈珺王璐鑫王彪刘庆胜陈强
Owner STATE GRID FUJIAN ELECTRIC POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products